Argonne National Laboratory
Renewable Energy Certificates (RECs) Statement of Work
October 1, 2026

1.0 Background

Argonne National Laboratory intends to purchase Renewable Energy Certificates (RECs) in support of meeting Federal Government requirements pursuant to the renewable electricity requirement in Section 203 of the Energy Policy Act (EPAct) of 2005 (42 U.S.C. § 15852) as amended by The Energy Act of 2020 § 3002(o) and § 3006(b)(2). REC purchases are calculated based on purchased electricity and are set at approximately 7.5% of total consumption.

2.0 REC Requirements and Eligibility

Argonne intends to purchase 7,000 megawatt-hours (MWh) of RECs to offset electricity consumption for FY 2026 (October 1, 2025 – September 30, 2026). To be eligible, RECs must meet the following criteria:
Unbundled: RECs must be sold separately from physical electricity. Eligible Technologies: Sourced from United States facilities meeting the statutory definition of renewable energy under 42 U.S.C. § 15852 (solar, wind, biomass, landfill gas, ocean/tidal/wave/thermal, geothermal, municipal solid waste, or qualifying new/increased hydroelectric generation). Placed-in-Service Date: Generated by facilities placed in service on or after October 1, 2010 (within 15 years prior to the start of the reporting fiscal year). Vintage / Generation Window: Produced between April 1, 2025 and January 1, 2027, consistent with Department of Energy (DOE) reporting rules (six months prior through three months after the fiscal year). Certification & Non-Double Counting: Third-party certified (Green-e® Energy Certified or DOE-recognized equivalent) to verify generation and prevent double counting. Ownership / Prior Use: Must not have been previously sold, marketed, claimed, or retired. Delivery Deadline: Delivered and retired electronically in an eligible tracking registry no later than November 27, 2026. Note: Contractors may offer a portion of the total volume; Argonne reserves the right to award multiple contracts to satisfy the total 7,000 MWh requirement based on price, availability, and past performance.

3.0 Delivery

The Contractor must provide electronic verification of delivery and retirement including: REC Certificate of Transfer provided at the time of delivery. Attestation Documentation containing the following required data points: Generation technology/fuel type
Generator facility name and ZIP code
Facility placed-in-service date
Specific generation date / vintage period