Statement of Work
Scope of Contract
Purpose:
This purpose of this Statement of Work is to define the tasks, responsibilities, and deliverables associated with the installation of a wildlife and rodent shield system to protect facility infrastructure, equipment, and building envelopes from damage caused by wildlife and rodents.
Scope of Work:
The contractor shall provide all labor, materials, equipment, tools, transportation and supervision required to install a complete wildlife and rodent shield system. Work includes, but is not limited to:
•
•
•

•
•

Assessment of facility vulnerabilities, including gaps, penetrations, vents, conduit entries, and structural features that allow wildlife intrusion. Fabrication or provision of wildlife and rodent resistant shielding materials (e.g., stainless-steel mesh, metal flashing, reinforced covers). Installation of shielding components around:
o Electrical and communication conduit entries.
o HVAC penetration and outdoor units.
o Foundation vents and crawlspace access points.
o Any other identified wildlife and rodent access points. Sealing all penetrations with appropriate pest-resistant sealants. Ensuring system meets applicable building, safety, and USDA facility standards.

Contractor Responsibilities:
•
•
•
•
•

Conduct a pre-installation site review with the designated facility representative. Provide documentation of materials, technical specifications, and installation methods.
Maintain a safe work environment and follow all OSHA and federal safety guidelines. Dispose of debris in accordance with local and federal requirements. Ensure all work zones remain clean and free of hazards.

Government Responsibilities:
•
•
•
•

Provide site access and escort where required.
Identify facility-specific restrictions or security protocols. Review and approve contractor’s installation plan prior to work. Provide power, lighting, and access necessary for installation.

Deliverables:
•
•
•
•

Written pre-installation assessment report.
Completion of installation in accordance with scope.
Post-installation inspection with facility representative. Final report including:
o Locations shielded
o Materials installed
o Photo of completed work
o Warranty information (if applicable)

Quality Assurance:
All work must be completed to professional standards. The contractor shall correct any deficiencies at no additional cost to the government.
Payment:

The beginning of the document. Download the full file to read on.