Statement of Work
Updated
A PDF document (214 KB) attached to USCG TRACEN CAPE MAY Monthly preventive maintenance services for fitness equipment., from the US Coast Guard. Due Dec 18, 2026, 11:00 AM (UTC-5).
File name: 3c_Statement of Work.pdf
The full file is for paid members, or buy this bid alone.
Preview
SOLICITATION NO. 67100PR270000152
U.S. COAST GUARD TRAINING CENTER CAPE MAY
STATEMENT OF WORK
FITNESS EQUIPMENT MONTHLY PREVENTIVE MAINTENANCE
1.0 GENERAL
1.1 Background
U.S. Coast Guard Training Center (TRACEN) Cape May operates a gymnasium in Building 269 at 1 Munro Avenue, Cape May, New Jersey 08204. The gymnasium supports physical training and readiness activities for enlisted recruits and other authorized users. Reliable, properly maintained fitness equipment supports safe facility operations and mission readiness.
1.2 Scope
The Contractor shall furnish all labor, supervision, tools, materials, equipment, transportation, and incidental services necessary to perform scheduled monthly preventive maintenance on every fitness equipment item identified in Section 2.3. This requirement is limited to scheduled preventive maintenance and associated reporting. Unscheduled repairs, emergency service, replacement parts, and corrective maintenance beyond the preventive-maintenance actions expressly stated in this SOW are outside the scope of this contract.
1.3 Objective
The objective is to complete monthly preventive maintenance for all listed equipment, identify safety or operational deficiencies, and provide the Government with a complete report of work performed and deficiencies observed.
1.4 Applicable Standards
The Contractor shall perform preventive maintenance in accordance with the applicable original equipment manufacturer (OEM) recommended procedures and accepted commercial industry standards for fitness equipment. Where OEM procedures are not available to the Contractor, the Contractor shall use accepted commercial industry practices appropriate to the equipment type and document that fact in the Monthly Preventive Maintenance Report and Service Log.
1.5 Site Visit
A site visit may be made available as stated in the solicitation. Offerors are responsible for examining the equipment, site conditions, access conditions, and other factors necessary to prepare an FFP quotation or proposal.
2.0 SPECIFIC REQUIREMENTS
2.1 Task One - Monthly Preventive Maintenance
Once during each calendar month of the period of performance, the Contractor shall perform preventive maintenance on every item listed in Section 2.3. The Contractor shall determine the number, qualifications, and supervision of its personnel and the methods used to perform the work, provided the Contractor meets all contract requirements and performance standards.
At a minimum, the Contractor shall perform the following preventive-maintenance actions, as applicable to
The beginning of the document. Download the full file to read on.