Home / *Updated PoP Dates* USCG Tracen Petaluma Monthly Boiler… / Document

Statement of Work

Updated

A PDF document (262 KB) attached to *Updated PoP Dates* USCG Tracen Petaluma Monthly Boiler Maintenance, from the US Coast Guard. Due Dec 7, 2026, 3:00 PM (UTC-5).

File name: 3c-Statement of Work.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

PR # 61200PR270000061

STATEMENT OF WORK

STATEMENT OF WORK (SOW)

FOR

MONTHLY BOILER MAINTENACE AND CHEMICAL TESTING

1.0 GENERAL

1.1 BACKGROUND

U.S. Coast Guard (USCG) Training Center (TRACEN) Petaluma located at 599 Tomales Road Petaluma; CA 94952 is the Coast Guard’s largest West Coast Training Center. Our graduates are the latest chefs, medics, storekeepers, yeoman, information systems technicians, electronics technicians, operations specialists, and aviation survival technicians (AST). We are also home to the Coast Guard Leadership Development Center’s Chief Petty Officer Academy.

1.2 SCOPE

The requirement of this contract is for the contractor to furnish all labor, tools, materials, equipment, supplies, services, supervision, and all other items necessary to provide comprehensive boiler chemical testing, preventative water treatment, and scale/corrosion control on eleven (11) hot water loops, one (1) steam boiler, and associated cooling tower systems located at USCG TRACEN Petaluma. The contractor is responsible for all phases of chemical water treatment, system monitoring, periodic inspections, inventory control, and waterside efficiency assurance.

1.3 OBJECTIVE

The service provider shall provide all labor, equipment, materials, vehicles, and appliances necessary to perform all operations in connection with routine water testing, scale and corrosion mitigation, equipment calibration, and chemical water treatment across facility heating loops, steam boilers, and cooling systems at U.S. Coast Guard (USCG) Training Center (TRACEN) Petaluma located at 599 Tomales Road, Petaluma, CA 94952-4154.

1.4 APPLICABLE DOCUMENTS

1.4.1 Reference Documents

The following documents may be helpful to the Contractor in performing the work described in this document:
• 29 CFR Part 1910 - Occupational Safety and Health Standards (General Industry) • 29 CFR Part 1910.1200 - Hazard Communication Standard (Safety Data Sheets / Chemical Safety)
• Federal Acquisition Regulation (FAR) 4.1103 - System for Award Management

2.0 SPECIFIC REQUIREMENTS/TASKS

2.1 TASK ONE. ROUTINE MONTHLY ONSITE SERVICE AND WATER TESTING

• Provide one (1) onsite service visit per calendar month to conduct testing, monitoring, and chemical servicing of eleven (11) hot water loops and one (1) steam boiler. • Perform standard chemical testing on boiler water, feedwater, condensate, and closed loop systems (evaluating pH, conductivity, dissolved solids, inhibitor levels, and alkalinity).
• Provide and maintain access to an online portal for digital service reporting, data

The beginning of the document. Download the full file to read on.

Other documents in this bid