Statement of Work
Updated
A Word document (74 KB) attached to MSB Lab Floor Coating Repairs, from the Agricultural Research Service. Due Dec 12, 2026, 6:30 AM (UTC-6).
File name: C04_SOW.docx
The full file is for paid members, or buy this bid alone.
Preview
US Department of Agriculture (USDA)
ERRC Mechanical Services Building Environmental Box Machinery Mods Statement of Work
TOC \o "1-2" \h \z \u ProjectPAGEREF _Toc2338 \h3
General InformationPAGEREF _Toc2339 \h3
1.0 Scope of WorkPAGEREF _Toc2340 \h3
2.0 BackgroundPAGEREF _Toc2341 \h3
Contractor RequirementsPAGEREF _Toc2342 \h3
3.0 Technical Requirements / TasksPAGEREF _Toc2343 \h3
4.0 Deliverables / SchedulePAGEREF _Toc2344 \h3
5.0 SecurityPAGEREF _Toc2345 \h3
Project
USDA, Eastern Regional Research Center, Wyndmoor, PA, Mechanical Services Building Environmental box Machinery Mods
General Information
1.0 Scope of Work
The Eastern Regional Research Center (ERRC), 600 East Mermaid Lane, Wyndmoor Pa requires repairs and recoating of flooring in the Mechanical Services Building (MSB) second floor laboratory. The existing epoxy floor coating is damaged and no longer meets the sanitary requirement for a BSL-2 laboratory. The work includes preparing existing floor and cove base surfaces for recoating, treating cracks, control and expansion joints, applying a base coat of pure epoxy and a chemical resistant polyaspartic finish coat with a texturing additive providing a non-skid surface.
2.0 Background
The Eastern Regional Research Center (ERRC) is one of four Regional Research Centers of the Agricultural Research Service, U.S. Department of Agriculture. The ERRC is home to the nation’s leading scientists and engineers who solve problems facing the U.S. today and tomorrow with fundamental, applied, and developmental research on agricultural commodities. Most of this research is conducted in the main building within two laboratory wings. The original building was constructed in 1940. Due to continuous upgrades and renovations, ERRC is very modern with respect to laboratory design and system condition.
Contractor Requirements
3.0 Technical Requirements / Tasks
The contractor shall provide all labor and materials to recoat floors identified in Atch 2, MSB Floor Repair Mods. Existing surfaces shall be prepared in accordance with manufacturer’s recommendations. Finishes shall meet sanitation requirements for a BSL-2 laboratory and withstand repeated washdown cleaning with chlorinated cleansers and disinfectants. Floor area to be recoated is approximately 2700 SF with approximately 450 linear feet of cove base. All work shall meet the requirements of UFGS 09 67 23.14 Chemical Resistant Resinous Floors. Color to be determined during material submittal.
4.0 Deliverables / Schedule
The beginning of the document. Download the full file to read on.