Attachment 2 – Statement of Work (SOW)

Montezuma NWR Maintenance Shop Roofing Project (RPI# 10022588)

1.0 Background

Montezuma NWR’s Maintenance Shop consists of a 3 bay single pitch roof building that is insulated and heated. The 2,442 square foot building is a stick build (wood construction). The existing asphalt shingle roof needs replacement. This project would replace the roof, redo the roof venting and replace all soffits, trim. The building is located at 3395 US Route 20 East, Seneca Falls, NY 13148.

2.0 Scope

The project consists of replacing the roof of an existing single pitch shop building. The current roof is asphalt shingle with three skylights and three roof vents. The project consists of the following, but not limited to:
• Remove existing asphalt shingle roof and underlayment, • Remove soffits, venting, skylights, and related protrusions, • Replace all rotted decking, rafters, framing,
• Skylights? Replace or reframe and insulate?
• Install roof venting: soffit and ridge/wall venting,
• Replace sewer venting seals,
• Install the appropriate ice and water and underlayment, • Install standing seam metal roof (no seams) with color TBD, • Install soffits, fascia with appropriate venting,
• Any other customary and standard roofing work.
Additive bid item:
• Remove skylights
• Frame, deck, waterproof and insulate skylight openings

3.0 Period of Performance

April 1, 2027 to July 30, 2027.

3.1 Hours of Operations

Regular business hours 7:00 a.m. to 4:30 p.m. Monday through Friday except for recognized Federal holidays.

Montezuma NWR Maintenance Shop Roofing Project (RPI# 10022588)

SECTION 019000 - GENERAL SAFETY REQUIREMENTS

PART 1 - GENERAL

1.1

SUMMARY

A.

The Contractor shall furnish plant, labor, equipment and appliances required for the safety and protection of persons and property at the project work site for the duration of this contract.

B.

The safety requirements specified in this section are in addition to those requirements specified in those sections pertaining to specific items of work required by this contract.

1.2

REFERENCES

A.

The publications listed below form a part of this specification to the extent referenced. 1.

CODE OF FEDERAL REGULATIONS (CFR)

a.
b.

B.
1.3

29 CFR 1910 Occupational Safety and Health Standards (OSHA) 29 CFR 1926 Safety and Health Regulations for Construction

The publications are referred to in the text by the basic designation only.

CONTRACTOR QUALITY CONTROL

A.

The Contractor is solely responsible for the safety and protection of persons and property at the