Statement Of Work (SOW)
USCGC SCIOTO Water Mist Fire Protection System

1. General - SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to remove all components of the existing Chemetron water mist firefighting or CO2 firefighting systems, then install a new Marioff Hi-Fog water mist system and install a new Kiddie AEGIS fire alarm control panel (FACP). 1.1.1 CGC SCIOTO (WLR 65504) - has a Chemetron water mist system that requires removal. 1.2 Government-furnished property.

MTI

ITEM DESCRIPTION

NSN/PN

QTY

ESTIMATED

COST

($/UNIT)

N

**Kit, Hi-Fog MAU
Watermist System
**Kit, Kiddie Aegis-XLT
Control Panel

P/N: AFP-USCG65-MAU

NSN: 1230-01F24-6865

P/N: AFP-USCG65-FACP

NSN: 1230-01F24-6864

1 ea.

$36,234.00

1 ea.

$12,049.00

N

*Government-loaned property, which must be returned to the vessel upon completion of the availability. **New equipment that the Government may provide for installation in place of existing equipment. ***Government-furnished property, which is to be supplied by either the vessel or the C4IT Service Center. Note: The ‘alpha’ characters in the NSN is correct. It is an internal NSN that is specific to the Coast Guard warehouse.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 65 WD 4803-007, Rev -, Retrofit Hi-Fog Watermist Engine Room Fire Protection System, Wiring Diagram
Coast Guard Drawing 65 WD 555-002, Rev A, Retrofit Hi-Fog Watermist Engine Room Fire Protection System, Layout and Arrangement

COAST GUARD PUBLICATIONS

Coast Guard Technical Publication (TP) 9163, SWBS 555, Mar 2024, Machinery Accumulator Unit (MAU) Water Mist Fire Extinguishing System
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements

Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2022, Shipboard Electrical Cable Test
Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2022, Shipboard Electrical Cable Removal, Relocation, Splice, Repair, and Installation Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures

3. REQUIREMENTS

3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep. The Contractor must utilize the services of a Qualified Technical Representative who is familiar with Marioff Hi-Fog water mist systems to accomplish the following on site: