STATEMENT OF WORK (SOW)
FOR
GAS LEAK DETECTION, REPAIR, VALVE INSTALLATION, AND ASPHALT
PATCHING SERVICES
1.0 GENERAL
1.1 Background
A gas leak has been identified in the parking lot at United Stated Coast Guard Training Center Birmingham Southern, 900 Arkadelphia Road, Birmingham, AL. Immediate repair is required to ensure safety, prevent further damage or hazard, and restore normal operations of the gas line and parking area. This requirement is for a firm-fixed-price construction-type services effort consisting of excavation, gas valve installation, backfill, and asphalt restoration. This project is pursued to eliminate the safety hazard associated with the gas leak and to return the affected parking lot area to full operational use.
1.2 Scope
The Contractor must perform all labor, supervision, materials, equipment, tools, and services necessary to complete the following work under this firm-fixed-price contract: • After line locate performed by others, saw-cut and excavate a 6-foot by 6-foot hole in the parking lot to locate the gas leak;
• Haul off all spoils from the site;
• Bring in and place gravel to backfill the excavation; • Install a gas valve in the parking lot;
• Patch the asphalt surface upon completion of the underground work. This SOW does not include private line locating, rock removal, slab x-ray, any underground utility work for electrical, gas, or irrigation systems beyond the specified gas leak repair and valve installation, sewer impact fees, water main fees, or landscaping. The Contractor is not responsible for any damage to unmarked utilities.
1.3 OBJECTIVE
The objective of this firm-fixed-price requirement is to safely locate and repair the gas leak, install a gas valve, restore the excavated area with gravel backfill, and complete asphalt patching so that the parking lot surface and gas system are fully operational, safe, and ready for use. All work under this contract must be completed no later than ten (10) business days after the date of contract award.
1.4 APPLICABLE DOCUMENTS
The Contractor must comply with all applicable federal, state, and local laws, codes, ordinances, and regulations governing excavation, gas-line repair, pressure testing, and asphalt paving work, including but not limited to Occupational Safety and Health Administration (OSHA) standards and the applicable Alabama state and local plumbing and gas codes.
October 28, 2026 | Page 1 of 8
2.0 SPECIFIC REQUIREMENTS/TASKS
The Contractor must perform the following tasks. This is a firm-fixed-price contract. The