Home / A911 Data Management and PSAP Redundant MPLS Services / Document

Statement of Work A911 Data Management System

Updated

A PDF document (139 KB) attached to A911 Data Management and PSAP Redundant MPLS Services, from the Department of the Air Force. Due Dec 2, 2026, 1:00 PM (UTC-5).

File name: SOW A911 Data Management System.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

STATEMENT OF WORK

A911 Routing and/or Location Data Management

1.0 BACKGROUND

This system will give dispatchers a redundant link and the ability to expand our E911 system, the main feature will be the ability to have a one-button transfer of 911 calls from Kent County 911 center to the base ECC while keeping ANI/ALI information with the call.

2.0 DESCRIPTION OF SERVICE

For Redundant Solutions (Options 3), make best e orts to acquire diversity and redundancy of highly available MPLS IP paths from its carrier partners from geographically redundant host sites to the mutually agreed upon terminating customer location. As stated in the FCC 911 Reliability Order dated Friday, January 17, 2014 there may not be a reasonably viable option to create diversity and redundancy of IP paths from the serving central o ice to customer terminating location due to the lack of commercially available carrier and/or physical links. Intrado will order dual IP paths to the mutually agreed upon customer location, but these paths may use the same provider or physical path.

3.0 SCOPE OF WORK

The following pricing proposal for Dover AFB contains monthly recurring fees for a turn-key pass through solution for A9-1-1 Routing and Location Data management. This quote shall cover one PSAP for a minimum of a 60 month term.

ALERT EQUIPMENT:






A9-1-1 ALI Services and Data Management
A9-1-1 Routing
Single Point of Contact Service
Performance Metrics
Solution Management

4.0 CONTRACTOR’S RESPONSIBILITY

The contractor must install equipment system that meets the customer’s needs while maintaining compliance with all applicable DoD/NFPA standards. The contractor may make recommendations as to relocate a piece of equipment from its current location in order to properly configure the system. The contractor must submit the design to the customer for approval before the contract is awarded.

5.0 GUARANTEE

All material must be guaranteed to be as specified and any product found deficient must be replaced at the contractor’s expense. All work must be completed in a professional manner according to standard practices. Any alteration or deviation from above specifications involving extra costs will be executed only upon written orders, and will become an extra charge over and above the estimate
Intrado will reconfigure the current network connectivity to re-route any existing wireline (Dover AFB housing) calls to Kent County and support transfer calls from Kent County to Dover AFB as a secondary PSAP. No additional fees will apply to this change.

The beginning of the document. Download the full file to read on.