Statement of Work Afloat EQT 2026-09-09
Updated
A Word document (36 KB) attached to Environmental Qualification Testing (EQT), from the Department of the Navy. Due Nov 18, 2026, 11:00 AM (UTC-5).
File name: SOW Afloat EQT 2026-09-09.docx
The full file is for paid members, or buy this bid alone.
Preview
Statement of Work (SOW) for Environmental Qualification Testing (EQT) of Combined All-domain Command and Control System (CAC2S) AFLOAT Data Processing Assembly and Workstation Mount
Scope
Purpose
This Statement of Work (SOW) defines the requirements for environmental and electromagnetic compatibility testing of the Combined All-Domain Command and Control System Afloat (CAC2S Afloat) Data Processing Assembly and Workstation Mount. The objective is to engage a qualified testing contractor to perform environmental qualification testing (EQT) to verify that this updated enclosure assembly and workstation mount meets all naval shipboard survival and operational requirements.
Background
The CAC2S Afloat system has undergone a hardware technology refresh, which changes multiple major pieces of equipment within the Data Processing Assembly and Workstation Mount. These changes alter the weight, center of gravity, power dissipation, thermal characteristics, and electromagnetic signature of this specific enclosure. Re-qualification is required to verify system integrity and compliance with shipboard environment standards.
2.0 Applicable Documents
The following documents of the exact revision listed below form a part of this SOW to the extent specified herein: MIL-DTL-901E: Shock Tests, H.I. (High-Impact) Shipboard Machinery, Equipment, and Systems, Requirements for MIL-STD-167-1A: Mechanical Vibrations of Shipboard Equipment (Type I - Environmental Vibration) MIL-STD-461G: Requirements for the Control of Electromagnetic Interference Characteristics of Subsystems and Equipment MIL-STD-810H: Department of Defense Test Method Standard: Environmental Engineering Considerations and Laboratory Tests MIL-STD-1399 (Section 300A): Shipboard Power Interface
3.0 Requirements
3.1 General Requirements
The contractor shall provide all necessary engineering, technical personnel, facilities, test equipment, fixtures, and materials to perform environmental qualification and EMI testing as specified in Section 3.3. The testing will be conducted on Government-Furnished Equipment (GFE). The contractor's responsibilities include:
1. Development of an Environmental Test Plan and EMI Test Plan for Government approval prior to testing. A001 – Once test plan is approved, Vendor would be able to invoice for test plan submitted. 2. Design, fabrication, and verification of any specialized test fixtures required for shock and vibration. 3. Conducting a Test Readiness Review (TRR) with the Government technical team.
The beginning of the document. Download the full file to read on.