Statement of Work-AFP 42 Commercial WIFI Install
Updated
A PDF document (203 KB) attached to Plant 42 Commercial Internet Services, from the Department of the Air Force. Due Nov 20, 2026, 6:00 AM (UTC-8).
File name: 1 - SOW-AFP 42 Commercial WIFI Install.pdf
The full file is for paid members, or buy this bid alone.
Preview
DEPARTMENT OF THE AIR FORCE
HEADQUARTERS 412TH TEST WING (AFMC)
EDWARDS AIR FORCE BASE CALIFORNIA
AFP 42 Commercial Internet Services
STATEMENT OF WORK
03 Nov 2026
412th Test Wing Operating Location
Air Force Plant 42
Palmdale, CA 93551
1.0 Scope
1.1.0 Air Force Plant 42 (AFP 42) is requesting a fully managed commercial internet service contract with provider to support 12 buildings and ensure reliable connectivity for Emergency Response operations, Mission Partners, distinguished visitors, training activities, and overall quality-of-life improvements.
1.2.0 The Contractor is considered a Commercial Service Internet Provider (CISP) in this statement of work.
2.0 Requirements Summary
2.1.0
Contractor shall execute a site survey as needed to determine their technical solution.
2.2.0 Contractor shall provide fully managed commercial internet services to include Firewall, Intrusion Detection System/Intrusion Prevention System (IDS/IPS), Rogue Prevention, Network Access Control with Wi-Fi Protected Access 2 (WPA2) or greater for security. 2.3.0 System shall be co-managed or administrated by both Contractors and AFP 42 Information Technology (IT) team.
2.4.0 System shall record and notify AFP 42 IT Team via email for any detection, prevention, unauthorized access and or suspicious network activities. 2.5.0 Contractor shall provide all necessary hardware and appliances that meet the technical solution. All network equipment must be Trade Agreements Act (TAA) compliant. 2.6.0 Contractor shall propose and install a Commercial Internet solution currently approved by the AFLCMC CITO UX Team for AFP 42 supported by Edwards AFB. The Contractor shall obtain an Authority to Operate (ATO) and comply with the “AFMC CISP Admin Management Guide” which is available upon request from the Contracting Officer. 2.7.0 The Contractor shall provide all required CISP ATO documentation for their proposed solution to the Government Program Manager (PM) for review to ensure compliance with the “AFMC CISP Admin Management Guide” prior to submission to the AFLCMC CITO UX Team. The Contractor and Government PM shall work together and submit the CISP ATO documentation to the AFLCMC CITO UX Team for final approval. 2.8.0 If the Contractor’s proposed internet service solution is not already approved by the AFLCMC CITO UX Team, the Contractor shall submit all required documentation to the Government PM for submission to the AFLCMC CITO UX Team within 10 business days from contract award. The Contractor is solely responsible for preparing and completing an
The beginning of the document. Download the full file to read on.