Home / Aggregate Stone Material - Fort Riley, Kansas / Document

Statement of Work Aggregate Stone 0001

Updated

A PDF document (4.0 MB) attached to Aggregate Stone Material - Fort Riley, Kansas, from the Department of the Army. Due Nov 13, 2026, 6:00 PM (UTC-6).

File name: Statement of Work (SOW) Aggregate Stone W911RX-27-Q-A002 0001.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

AGGREGATE STONE: W911RX-26-Q-A032 W911RX27QA002 0001

1.STATEMENT OF WORK (SOW)

1.1 This Statement of Work (SOW) defines the requirements for the procurement, hauling, and delivery of various aggregate stone materials to multiple Directorate of Public Works sites. The primary objective is to maintain tactical trails, base road infrastructure, and erosion control measures essential for sustained mission readiness. This contract is a single-award Indefinite-Delivery/Indefinite-Quantity (IDIQ) contract for aggregate materials, comprising a twelve-month Base Period, four (4) consecutive twelve-month Option Periods exercisable pursuant to FAR 52.217-9, and an optional extension not to exceed six (6) months pursuant to FAR 52.217-8. Deliveries shall be authorized exclusively through individual delivery orders issued on an as-needed basis to meet installation mission requirements. While individual delivery orders are historically estimated to range between 1,200 and 1,400 tons, actual quantities will fluctuate based on operational demand, and no annual or per-order minimums are guaranteed. Pursuant to FAR 52.216-22, the Government’s sole minimum purchasing obligation is a cumulative amount of $2,000.00, applicable exclusively to the Base Period, while the aggregate ordering ceiling across all ordering periods, authorized extensions, and surge requirements shall not exceed $4,500,000.00. As this procurement is a 100% total small business set-aside, the Contractor must comply with the Nonmanufacturer Rule (13 CFR § 121.406 and FAR 52.219-33), requiring that all aggregate materials furnished under this contract be mined, quarried, or produced by a small business-owned quarry.

2. Technical Specifications

2.1 All aggregate materials must conform to the following specifications. The contractor is responsible for providing laboratory certification (AASHTO or ASTM standards) per material source before initial delivery (in-house quarry laboratory results are acceptable; re-certification is only required if the material source/quarry changes). Physical material samples are not required during evaluation; laboratory certification documentation is sufficient.

Material
Code

Specification Reference

Primary Mission Application

AB-3

KDOT Section 1104

Aggregate Base Type 3: High-density base course for heavyduty tactical vehicle lanes and hardstands.

SA-1

KDOT Division 1100,
Section 1104 / Section
1111 (Crushed Materials
Only; Uncrushed SandGravel is Strictly
Prohibited)

Select Aggregate: Used for subgrade stabilization and

The beginning of the document. Download the full file to read on.

Other documents in this bid