Home / Common Access Card (CAC) Facility Entry Door Access Control / Document

Statement of Work B904 Access Control

Updated

A Word document (106 KB) attached to Common Access Card (CAC) Facility Entry Door Access Control, from the Department of the Army. Due Nov 20, 2026, 2:00 PM (UTC-5).

File name: A2 SOW B904 Access Control.docx

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

107th Attack Wing

New York Air National Guard
Niagara Falls, New York 14304

Project Specification
For

RVKQ 27-1234

Install Facility Access Controls

Building 904

Logistics Readiness Squadron
Supply Warehouse

30 October 2026

PROJECT MANUAL

DIVISION 1- GENERAL REQUIREMENTS

-01010Summary of Work

-01060Reference Standards

-01070Abbreviations

-01090Definitions

-01340Shop Drawings Product Data and Samples

-01400Quality Control

-01600Material, Products and Equipment

-01700Project Closeout

-01710Cleaning

-01720Project Record Documents

-01750Warranties

DRAWINGS

SECTION 01010

SUMMARY OF WORK

1.1RELATED DOCUMENTS:

A. General provisions of Contract, including General and Supplementary Conditions and other Division-1 Specification Sections, apply to this Section.

1.2PROJECT DESCRIPTION:

EXISTING CONDITIONS: Building 904 is an approximately 60,000 square foot mixed use office and warehouse space facility that is home to the 107th Logistics Readiness Squadron (LRS). The warehouse section is a secure area that now requires access to personnel not organically assigned to the 107th LRS. As such, the Government now requires the contractor to install, at a minimum, all necessary electronic locks, control mechanisms, compatible door hardware, wiring, and all associated equipment to enable three existing man doors to be opened from the outside via standard Department of War (DoW) Common Access Cards (CACs) (Base Scope). In addition to the Base Scope, the facility drawing details Option work areas to include 3 CAC-enabled facility access doors as well as a Closed-Circuit Television (CCTV) monitored area of the warehouse.

BASE PROJECT

PART A:

Determine if your door uses a fail-secure electric strike, a fail-safe magnetic lock (maglock), or an electrified mortise lock. CAC implementations typically require Wiegand or OSDP-compatible smart card readers that support PKI (Public Key Infrastructure) certificates.

Plan the layout for the access control panel, power supply (12V or 24V DC), backup battery, and cable runs from the door to the network/server room.

Mount the Reader: Install the CAC smart card reader at an accessible height—typically between 36 and 48 inches from the finished floor for ADA compliance. Ensure it has a clear view or is weather-protected if mounted outdoors.

Install the Locking Device. For an electric strike, cut and fit the strike pocket into the metal door frame. For a magnetic lock, mount the electromagnet to the underside of the frame header and the armature plate to the door leaf.

The beginning of the document. Download the full file to read on.

Other documents in this bid