Statement of Work - Ceiling OutletsV2
Updated
A PDF document (180 KB) attached to Ga-Okefenokee NWR-00000-NEW VC Electrica, from the Departmental Offices. Due Nov 17, 2026, 12:00 PM (UTC-5).
File name: B08_-_SOW_-_Ceiling_OutletsV2.pdf
The full file is for paid members, or buy this bid alone.
Preview
STATEMENT OF WORK
Construct Visitor Center
Okefenokee National Wildlife Refuge – Folkston, GA
1. General
a. The Contractor shall supply all material, labor, supplies, supervision, and equipment to accomplish the following Statement of Work.
b. Provide and install the ceiling electrical outlets listed herein on the Okefenokee National Wildlife Refuge Visitor Center in Folkston, GA.
c.
All materials, products and components used to complete this project shall be made in the USA with documentation. The Buy American act will be strictly enforced.
d. Contractor shall remove all resulting trash and debris from work performed. e. Contractor will be required to work within and around an active construction site with multiple trades. Coordination with refuge and Prime Contractor will be required. 2.
Construction Program
a. Add (12) electrical outlets in Exhibit 101 and Hall 106 ceilings according to the attached dimensioned ceiling plan layout.
b. Install the (12) electrical outlets on their own circuit, so refuge can turn Exhibit lighting off separately from main Exhibit lighting.
c.
The (12) electrical outlets will need to be installed in RMC, similar to current electrical installation.
d. The Exhibit track lighting utilizing these (12) outlets will use approx. 9 amps total.
3. Submittals
a. All submittals shall be based on Statement of Work and are subject to Government approval. b. Submittals to include product, material, fasteners, finishes, warranties, Buy American Act and any item COR deems required for project completion.
PERIOD OF PERFORMANCE
Period of performance beginning 10 calendar days from the Notice to Proceed: 90 Calendar days. * Onsite utilities and facilities will not be available under this contract to contractors and subcontractors.
Okefenokee NWR
Construct VC
August 26, 2026
PROJECT CONTACTS
3.1.
Questions regarding the Site shall be directed to:
U.S. Fish & Wildlife Service
Okefenokee National Wildlife Refuge
Folkston, Georgia
Contact:
Michael Lusk – Refuge Manager
(912) 206-6304
Telephone:
3.2.
Questions regarding the scope of work and technical matters shall be directed to: U.S. Fish & Wildlife Service
Okefenokee National Wildlife Refuge
Folkston, Georgia
Contact:
Michael Lusk – Refuge Manager
Telephone:
(912) 206-6304
3.3
Questions regarding contractual items shall be directed to:
U. S. Fish & Wildlife Service
Contact:
Contract Specialist
Telephone:
END OF STATEMENT OF WORK
Okefenokee NWR
Construct VC
The beginning of the document. Download the full file to read on.