STATEMENT OF WORK

USCGC MORRO BAY F/O Tanks clean and inspect and Bilge cleaning

SECTION 1 – Scope of Work

The contractor must provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to perform as defined in this Scope of Work, the contractor must perform to the standards in this contract.
Work Statement
•
•
•

Date of work: 20 November 2026 to 01 December 2026.
Estimated on site time: Not to exceed 3 days.
Certifications needed: Contractor shall provide a vacuum truck, hoses, and operators that are certified to transfer oils over the water.

Scope of Services
Contractor provides services to thoroughly clean bilges to meet (CG supplied) Marine Chemist gas free engineer requirements and provide 200 feet of suction hose and a vacuum truck to offload via vacuum approximately 2,500 gallons of used engine oil, fuel and bilge water from the bilges. Please note that these fluids are mixed.
Contractor provides services to dispose of approximately 11,500 gallons of contaminated Diesel fuel and conduct tank cleaning. The Contractor must dispose of residual tank contents and any cleaning fluids in compliance with all applicable Federal, state, and local laws, ordinances and regulations. Document a complete chain of custody record of the removed tank contents and generated wastes, from the vessel to the point of final destination or delivery. Submit document to the Ships Representative upon completion of work.
Tank closing. Ensure tank closure is accomplished in the presence of the Coast Guard Inspector. Ensure any or all pipe plugs are removed, and operation of the installed TLI system is SAT before closing of the tank. After satisfactory inspection by the Coast Guard Inspector and completion of all authorized repairs, close tank manhole cover(s) with new gasket material conforming to AMS-C-6183. Chase threads on studs to ensure, even installation of the access covers. Renew any damaged nuts.

SECTION 2 – Place of Performance:

USCGC MORRO BAY

1055 East 9th ST
Cleveland, OH 44114

SECTION 3 – Contact for questions:

Any questions regarding scope of work must be directed to Ship’s Reprehensive: CWO GREGORY TARKER, (206) 815-6706, [email protected] All requests for site visits must be scheduled through CWO GREGORY TARKER, (206) 8156706, [email protected]. Requests can be submitted via phone call or e-mail. A site visit for all interested parties is scheduled as below. All interested offerors must arrive no