Statement of Work to Clean Rain Gutters and Downspouts

Updated

A PDF document (416 KB) attached to F-FAC-SVC-Clean Residential Rain Gutters & Downpouts-GO-CSS, from the Department of State. Due Nov 23, 2026, 12:00 AM (UTC+1).

File name: SOW to Clean Rain Gutters and Downspouts.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

MAINTENANCE & REPAIR STATEMENT of WORK

Frankfurt, Germany
Gutter and Downspout Cleaning and Minor Repair Services Carl Schurz Siedlung

CONTENTS:

PART ONE

PART TWO

PART THREE

PART FOUR

GENERAL

PRODUCTS

EXECUTION

SCHEDULE

U.S. CONSULATE GERNERAL FRANKFURT, GERMANY

FACILITY MANAGEMENT

09/15/2026

STATEMENT of WORK

UNCLASSIFIED

PART ONE – GENERAL

C.1.1

SUMMARY:

A.
The U.S. Consulate General Frankfurt requires cleaning, inspecting, minor repair, and maintenance of the rain gutters and downspouts of 32 residential buildings at the Carl Schurz Siedlung to ensure proper stormwater drainage and prevent water damage to the facility. The Contractor shall provide all necessary labor, materials, supervision, and equipment to complete the project. Work includes, but is not limited to: 1.
Remove all debris (leaves, dirt, twigs, nests, sediment, and other obstructions) from all gutters, valleys, and downspouts
2.
Inspect gutters, downspouts, hangers, brackets, seams, and joints for damage, leaks, rust, sagging, or separation from the structure
3.
Perform minor repairs identified during cleaning and inspection a. Minor repairs shall be billed on a time-and-materials basis

C.1.2

SUBMITTALS:

A.
Contractor’s crew individual identification information for visitor access requests. B.
Submit list of all subcontractors with evidence of subcontractor's insurance coverage. C.
Project schedule showing work phasing and proposed daily progress.

C.1.3

CONTRACT ADMINISTRTION

A.
The Contractor shall not perform any work outside this Statement of Work unless authorized in writing by the Contracting Officer (CO).
B.
The CO will issue a Notice to Proceed (NTP).
C.
The Contracting Officer’s Representative (COR) will oversee daily execution and ensure compliance.
D.
Any proposed changes must be submitted in writing and approved before work proceeds. E.
The Contractor shall identify a Project Site Manager who shall be responsible for the overall management of the project and shall represent the Contractor on the site during construction. The Project Site Manager is required to be German and English-speaking and shall be approved by the COR.

C.1.4

QUALITY CONTROL:

A.
The Contractor shall be responsible for the professional quality, technical accuracy, and the coordination of all construction and other services furnished under this contract. The Contractor shall, without additional compensation, correct or revise any errors or deficiencies in its construction and other services.