Home / Corinth National Cemetery, 838CM3036 – Gravesite Expansion… / Document

Statement of Work Corinth GSE and Cem Improvements

Updated

A PDF document (158 KB) attached to Corinth National Cemetery, 838CM3036 – Gravesite Expansion and Cemetery Improvements, from the Department of Veterans Affairs.

File name: SOW_Corinth_GSE and Cem Improvements.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

INVITATION FOR BID

SCOPE OF WORK

FOR

CORINTH NATIONAL CEMETERY, 838CM3036 – GRAVESITE EXPANSION AND

CEMETERY IMPROVEMENTS

A. PART I – PROJECT OBJECTIVES

A1. Statement of Work

STATEMENT OF BID ITEM(S)

A. CLIN 0001 – GRAVESITE EXPANSION AND CEMETRY IMPROVEMENTS BASE

BID, GENERAL CONSTRUCTION: Installation of all work shown on the plans and described in the specifications. Includes the following: The scope of this project is to expand the burial capacity for the next 15 years and provide new facilities for administration, committal services, maintenance, and improve traffic flow at this national cemetery. Major scope items include site development for in-ground cremains burial sections, demolition of the existing lodge and maintenance facilities, the construction of a combined Administration and Maintenance facility with public restrooms, committal service shelter, and fenced maintenance yard with a materials storage structure, new site furnishings and wayfinding signage, new turf and landscaping, new irrigation, improvements to the existing irrigation system, and miscellaneous other work as included in the construction documents.
A.2 General Conditions
1. All work will be accomplished during normal business hours (8:00 am to 4:30 pm) Monday through Friday, except Federal Holidays.
2. Before beginning any demolition work, the Contractor shall survey the site and examine the drawings and review the scope of work to determine the extent of the work. The Contractor shall take the necessary precautions to avoid damages to existing items to remain in place, to be reused or to remain the property of the Cemetery. Any damaged items shall be repaired or replaced at the Contractors expense as directed by the Contracting Officer’s Representative (COR).
3. Establish construction limits, install safety controls, and install construction fencing as approved by the COR.
4. SITE SURVEY: Locate and stake/flag all underground utilities. 5. SITE CLEARING: Remove grass and other vegetation or obstructions as required to permit grading of the site within the project limits. Dispose/haul away and dump trash, debris and waste to an approved disposal site.
6. EROSION CONTROL AND SITE DRAINAGE: Contractor shall provide erosion control measures to prevent erosion or displacement of soils and discharge of soil bearing water runoff or airborne dust.

7. SITE GRADING AND FINISHING: Perform grading within the limits of the project to the lines, grades, and elevations indicated and as specified. Thoroughly clean up the work area

The beginning of the document. Download the full file to read on.

Other documents in this bid