Statement of Work Correct Mather Loop Road and Install Speed Bumps Draft
Updated
A PDF document (233 KB) attached to FY27 NRM - Correct Mather Loop Road and Install Speed Bumps, from the Department of Veterans Affairs. Due Nov 2, 2026, 12:00 PM (UTC-8).
File name: SOW 612A4-27-004 Correct Mather Loop Road and Install Speed Bumps_DRAFT.pdf
The full file is for paid members, or buy this bid alone.
Preview
VA Northern California Health Care System
612A4-27-004
Statement of Work
Correct Mather Loop Road and Install Speed Bumps
Project # 612A4-27-004
1. GENERAL INTENTION
A. The purpose of this project is to remediate the existing pedestrian routes at Sacramento VA Medical Center Parking Lot 4 and crossing Denker St to Building 700. The remediation replaces failing rubber speed bumps with built-in asphalt speed humps, installs a raised crosswalk, expands the existing sidewalk to meet VA access widths, adds a second sidewalk to provide an alternative path, and revises the drive aisle and parking to meet one-way flow for VA Northern California Healthcare System (VANCHCS).
B. Contractor will furnish all labor and materials needed to perform all surveying, demolition, surface preparation, and installation required by this scope and attached specifications.
C. Location of work; the geographic location for service are the following areas: Sacramento VA Medical Center
10535 hospital Way
Mather, CA 95655
D. The contractor will assume that there are no staging areas available within the facility premises. If necessary, staging areas may be put into effect at the discretion of the COR, depending on availability. The Contractor will note that there is absolutely NO Contractor employee parking in Patient Parking Only designated areas. VANCHCS will not invalidate or make reimbursement for parking violations for the Contractor under any conditions.
E. Schedule of work; all work will be performed during normal working hours from 7:30 AM to 4:00 PM, Monday through Friday (not including observed holidays). Contractor may submit a formal request to the VA COR a minimum of three (3) working days in advance for approval to work off hours. F. VA Approval of work that is outside of normal working hours is not authorization for the Contractor to submit a claim against the VA to cover premium pay. The Contractor is responsible for planning work based on the constraints stated in this SOW and must account for premium pay in their bid.
G. The Contractor must provide their own parking lot closure signage and barriers notifying the public of the parking lot closure and detours to other available parking.
VA Northern California Health Care System
612A4-27-004
H. The contractor will dispose of all components demolished or replaced as part of this project.
2. SCOPE OF WORK
A. The contractor must survey the existing features within the project limits, as shown in the Reference Drawings. The surveyor’s report must be a comprehensive
The beginning of the document. Download the full file to read on.