Home / Replace Door Control Unit / Document

Statement of Work

Updated

A PDF document (923 KB) attached to Replace Door Control Unit, from the Department of the Air Force. Due Nov 20, 2026, 10:00 AM (UTC-8).

File name: FA462027QC002 SOW (DRAFT).pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

STATEMENT OF WORK

FOR

B1009 REPLACE DOOR CONTROL UNIT

D

R

AF
T

FAIRCHILD AIR FORCE BASE, WA

October 2026

Statement of Work (SOW)
B1009 Replace Door Control Unit
Fairchild AFB, WA

1. DESCRIPTION OF SERVICE. Contractor shall provide all necessary labor, tools, equipment and

materials to purchase, remove/replace, program, and test the primary internal logic controller unit for the Albany UltraFast high-speed commercial roll-up door, to include the controls, hardware and electrical system connections at Building 1009 on Fairchild AFB, WA. Upon completion the contractor will provide fully operational door systems as described in this Statement of Work. All work shall be performed in accordance with all Federal, State, local laws and regulations, manufacturer’s recommendations and requirements set forth in this Statement of Work (SOW).

2. SCOPE OF WORK. The Contractor shall provide and install all material, equipment and services including labor, unless otherwise specified herein, required under this contract.

ii.
iii.
iv.
v.

Coordinate disconnect of electrical power system of existing door operators at least two days prior to start of work with 92 CES point of contact, Mr. Michael Ehrman at 509-247-4238. Remove existing primary internal logic controller unit and dispose of materials at an approved off-site location.
Procure, deliver, install, and test a replacement primary internal logic controller unit, compatible with the existing Albany UltraFast high-speed commercial roll up door. Coordinate reconnection of electrical power system with 92 CES point of contact. Adjust all controls and safety devices to ensure doors are fully operational. Contractor shall clean up work area at end of each workday and upon completion of work.

AF
T

i.

3. GENERAL INFORMATION

D

R

3.1 HOURS OF OPERATION: Hours of operation are 0700-1630 Monday through Friday, excluding Federal Holidays and any other designated down day. Work can be done at other than the normal hours of operation with the approval of the Contracting Officer. The contractor shall coordinate in advance all hours of work and any service interruptions with Civil Engineering points of contact. January 1
3rd Monday in January
3rd Monday in February
Last Monday in May
June 19
July 4
1st Monday in September
2nd Monday in October
November 11
4th Thursday in November
December 25

New Year’s Day
Martin Luther King, Jr. Day
President’s Day
Memorial Day
Juneteenth
Independence Day

The beginning of the document. Download the full file to read on.