Home / Portable Latrines / Document

STATEMENT OF WORK

Updated

A PDF document (88 KB) attached to Portable Latrines, from the Department of the Army. Due Oct 26, 2026, 9:00 AM (UTC-4).

File name: STATEMENT OF WORK (SOW).pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

STATEMENT OF WORK (SOW)

RENTAL AND SERVICE OF PORTABLE CHEMICAL LATRINES (PCL) AND PORTABLE HAND

WASHING STATIONS

1.0 Introduction

This SOW outlines the requirements for the rental, delivery, and servicing of portable latrines and hand wash stations in support of personnel across multiple 15th Signal Brigade Training Areas.

2.0 Scope of Work

The contractor shall provide, install, service and stock a total of 84 portable latrines and 37 hand washing stations distributed across the locations specified in this SOW.

3.0 Description of Services:

For all locations listed in the table below, the contractor shall: • Deliver latrines and handwash stations
• Pump out and dispose of all liquid and solid waste in accordance with federal, state, and local regulations.
• Thoroughly clean and sanitize the interior of each latrine. • Restock toilet paper in each latrine (minimum of two rolls). • Refill hand washing stations with fresh water.
• Restock soap and paper towels in each hand wash station. • Ensure all units are free of debris and in good working order. Location

Latrines (Qty)

Hand Wash
Stations (Qty)

Service Frequency

TA 10A (FOB READY) – B25203

2 services per week

TA B25101 (Pole Farm)

2 services per week

TA 3

2 services per week

TA 9

2 services per week

TA 24 (MOUT SITE)

1 service per week

TA 24 (FOB COBRA)

1 service per week

Total

STATEMENT OF WORK (SOW)

RENTAL AND SERVICE OF PORTABLE CHEMICAL LATRINES (PCL) AND PORTABLE HAND

WASHING STATIONS

4.0 Period of Performance

The period of performance shall be from the date of contract award for the following PoPs for one (1) 12-month Base plus four (4) Option Years:
Base: 1 April 2027 - 31 Mar 2028
Option Year 1: 1 April 2028 - 31 Mar 2029
Option Year 2: 1 April 2029 - 31 Mar 2030
Option Year 3: 1 April 2030 - 31 Mar 2031
Option Year 4: 1 April 2031 - 31 Mar 2032

5.0 Contract Type: Firm-Fixed Price

6.0 Hours of Operation: Monday – Friday, 0900hrs-1600hrs 7.0 Place of Performance: The work to be performed under this contract will be performed at Ft. Gordon, GA at the locations listed in the table above. 8.0 Security Requirements: Contractor employees performing on the contract must be U.S citizens and have the ability to gain access to Fort Gordon, Georgia. 9.0 Installation Access: All contractor employees, including subcontractors, shall comply with applicable installation and facility access security policies and procedures at all work locations.
10.0 Identification of Contract Employees: IAW FAR 37.11 contractor employees shall

The beginning of the document. Download the full file to read on.