STATEMENT OF WORK
FLOORING AND PAINT
BUILDING 2272
PDPG262858
163 CES CALIFORNIA AIR NATIONAL GUARD
MARCH AIR RESERVE BASE CA
15 JUNE 2026
SPECIFIC REQUIREMENTS
1.1
PURPOSE
Replace flooring and paint interior walls at Building 2272 for the 163 ATKW CA ANG at March ARB.
1.2
SCOPE
A
Demo VCT, carpet, vapor barrier, and rubber base.
B
Prep floors and walls.
C
Provide polished concrete
a.
1.3
Submit test report for 50 GU @ 60 degrees.
D
Provide vapor barrier and carpet tile.
E
Provide rubber base.
F
Paint interior walls.
G
Work is specified and shown on the drawings.
COST LINE ITEMS
A
CLIN 1
CARPET
B
CLIN 2
POLISHED CONCRETE
C
CLIN 3
PAINT
1.4
PERIOD OF PERFORMANCE
1.5
ATTACHMENTS
A
Plans
B
Contract Information
60 DAYS
GENERAL REQUIREMENTS
2.1
BASE ACCESS
Per Contract Information
2.2
SUPERINTENDENT
Per Contract Information
2.3
ANTI TERRORISM TRAINING
Per Contract Information.
2.4
SCHEDULE
Per Contract Information
2.5
SUBMITTALS
Per Contract Information
FLOORING AND PAINT
Buildings 2272
March Air Reserve Base California
2.6
MEETINGS
Per Contract Information
2.7
CODES
Comply with UFC requirements and all codes and standards reference therein including applicable federal, state, and base codes. The most stringent requirements shall apply. Contractor shall address discrepancies with government prior to construction.
2.8
CONSTRUCTION
All work shall be performed in a workmanlike manner consistent with industry standards and manufacturers recommendations.
2.9
CHANGES
Any alteration, or deviation from the drawings/specifications or contract involving extra costs or credits will be executed as mutually agreed upon and be verified by written change order.
2.10 TESTS & INSPECTIONS
Provide all required tests and inspections required by code.
2.11 WARRANTY
Guarantee the material and workmanship for a minimum of one (1) year following the date of substantial completion.
2.12 STAGING AND SITE ACCESS
A.
Offsite materials and equipment shall be staged in locations determined by the COR.
B.
Contractor parking shall on site or designated stalls determined by the COR. On street parking is not permitted.
2.13 DEMOLITION
Dispose per industry standards and regulations to approved off-base location.
2.14 PROJECT CLEANUP
Construction debris will be removed daily. Prior to final acceptance, contractor shall remove all waste materials and debris arising from construction and shall present all construction areas in a broom clean condition.
2.15 HOURS OF OPERATION
Construction shall be performed during normal duty hours which are 0700-1600, Mondays through Fridays, excluding federal holidays, unless otherwise required in the contract or approved by the