STATEMENT OF WORK (SOW)

New Fiber Optic Cable (FOC) to Fightline and Weather Related (Wx) Equipment
Luke AFB AZ
5-May 2026

Prepared By

56 CS/SCXP

7320 N Homer Drive
Luke AFB AZ
85309

Section

Title

Page

1.0

SCOPE

2.0

REQUIREMENTS

2.1

GENERAL REQUIREMENTS

2.1.1

Safety Requirements

2.1.2

Site Coordination

2.1.2.1

Confined Space

2.1.2.2

Accident/Incident Reporting and Investigation

2.1.2.3

Work Area(s)

2.1.2.4

Traffic Control

2.1.2.5

Airfield Driving

2.1.3

Security Requirements

2.1.3.1

Security Clearances

2.1.3.2

Operational Security (OPSEC)

2.1.4

Environmental Compliance

2.1.5

Permits

2.1.6

Integrated Process Team (IPT)

2.1.7

Quality Assurance

2.1.8

Contractor Personnel

2.1.8.1

Project Management

2.1.8.2

Site Point of Contact (POC)

2.1.8.3

Personnel Requirements

2.1.8.4

Minimum Contractor Qualifications

2.1.9

Warranty

2.1.10

Manuals and Practices

2.2

SPECIFIC REQUIREMENTS

2.2.1

Backboards

2.2.2

Equipment Cabinets

2.2.2.1

Grounding and Bonding

2.2.2.2

Bushings

2.2.3

Outside Plant Requirements

2.2.3.1

Existing Maintenance Holes

2.2.3.2

Measurements

2.2.3.3

Underground Utilities Markings

2.2.3.4

Closures for Cable Splicing in Maintenance Holes

2.2.3.4.1

Fiber Optic Splices

2.2.3.5

Splice Connectors

2.2.3.6

Labeling

2.2.3.6.1

Cable Tags

2.2.3.6.2

Fiber Optic Distribution Panel (FODP) Marking

2.2.3.6.3

New Ducts

2.2.3.7

Cable Terminations

2.2.3.7.1

Fiber Optic Terminations

2.2.3.7.2

Grounding and Bonding

2.2.3.8

FOC Maintenance Loop

2.2.3.9

New Maintenance Holes/Hand-holes

2.2.3.9.1

Cable Racks and Cable Rack Supports

2.2.3.10

Underground Conduit System

2.2.3.10.1

Composition

2.2.3.10.2

Installation

2.2.3.10.3

Bends and Sealing

2.2.3.10.4

Utility Separation

2.2.3.10.5

Spacers and Tracer Wire

2.2.3.10.6

Warning Tape

2.2.3.10.7

Entrance Conduits into Existing Maintenance Holes

2.2.3.10.8

Pull Boxes/NEMA 4 Enclosures

2.2.3.10.9

Excavation/Building Penetrations

2.2.3.10.10

Conduit Protection

2.2.3.10.11

Pull Tape

2.2.4

New Outside Plant Installation

2.2.4.1

Infrastructure Installation

2.2.4.1.1

New Manholes (MH)/Hand-Holes (HH)

2.2.4.1.2

New Duct Bank Infrastructure and Geotextile Fabric Innerduct Installation

2.2.4.1.3

New Geotextile Fabric Innerduct (a.k.a. Maxcell/MC) In
Existing Conduit

2.2.4.1.4

New Network (NW) Cabinet Installation

2.2.4.1.5

New Back-Board (BB) Installation

2.2.4.2

New Fiber Optic Cable (FOC) Installation

2.2.5

Project Residue

2.2.6

Site Restoration

2.2.7

Service Outages

2.2.8

National Pollution Discharge Elimination System (NPDES)

2.2.9

Identification Marking

2.2.10

Installation Schedules

2.2.11

Status Reports

2.2.12

Drawings

2.2.12.1

As-Built Drawings

2.2.12.2

Butterfly Drawings

2.2.12.3