Home / F/A-18 Fuel Pressure Gage Kit, P/N: 3867AS2060-1 / Document

Statement of Work for Fuel Pressure Gage Kit

Updated

A PDF document (148 KB) attached to F/A-18 Fuel Pressure Gage Kit, P/N: 3867AS2060-1, from the Department of the Navy. Due Oct 29, 2026, 4:00 PM (UTC-4).

File name: SOW for Fuel Pressure Gage Kit.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

STATEMENT OF WORK (SOW)

For
Fuel Pressure Gage Kit, P/N: 3867AS2060-1

1.0 SCOPE

This SOW addresses the manufacture and delivery of quantity seventy (70) of the Fuel Pressure Gage Kit, P/N: 3867AS2060-1. This procurement is in support of the F/A-18 E/F program.

2.0 GOVERNMENT FURNISHED INFORMATION (GFI):

2.1 Technical Data Package (TDP 3867AS2060-1

3.0 REQUIREMENTS

3.1 Manufacture and Assembly. The Contractor shall provide materials and services to manufacture and assemble the Fuel Pressure Gage Kit, P/N: 3867AS2060-1, in accordance with the United States NAVY (USN) approved design. The manufacture and assembly shall be performed at the Contractor’s facility.
3.2 Serialization. The Fuel Pressure Gage Kit, P/N: 3867AS2060-1, shall be assigned sequential serial numbers beginning with 001.

4.0 PRODUCTION DELIVERIES, INSPECTION AND ACCEPTANCE

4.1 Delivery: The Contractor shall deliver the PSE end item listed above. The PSE shall be delivered to the Government within 100 days after contract award. All delivery orders shall be delivered Monday thru Thursday to the following addresses, unless otherwise specified:
Shipping Address:

DODAAC: N68335

NAWCAD LKE

SE Staging Facility Team Lead
Hangar 1

Rt. 547, JBMDL, NJ 08733

ATTN: Jennie Kildare
(732) 323-2607
4.2 Inspection and Acceptance: The Government shall perform inspection/acceptance at the contractor’s facility.

5. PACKING, STORAGE, HANDLING AND TRANSPORTATION (PHS&T):

5.1 Packing Requirements:

Packing shall be in accordance with ASTM D3951-18 (excluding para 4.2-4.3) utilizing weather resistant box and require same by vendors and subcontractors (for materiel being shipped to the government). The use of loose fill materials, asbestos, excelsior, newspaper and shredded paper (all types) are prohibited. In addition, all Wood Packaging Materials (WPM) shall be heat treated or chemically treated in accordance with the requirements of the International Standard for Phytosanitary Measures (ISPM) 15, "Regulation of Wood Packaging Material in International Trade."

5.2 Markings:

Marking shall be in accordance with MIL-STD-129R. Additionally, special marking labels (fragile, delicate, etc.) shall be applied to all units, intermediate, and shipping containers as an integral part of the total pack. The Contractor shall select the appropriate special marking label(s) as additional means to protect the items during packaging, handling, storage, transit, and removal from the pack.

5.3 Transportation:

Ensure safe transportation of packaged items at the lowest rate to the point of delivery and shall

The beginning of the document. Download the full file to read on.

Other documents in this bid