Statement of Work - Gondola Detailed Design and Construction REV1

Updated

A PDF document (694 KB) attached to Sonar Gondola Detailed Design and Fabrication, from the National Oceanic and Atmospheric Administration. Due Nov 9, 2026, 3:00 PM (UTC-5).

File name: Statement of Work - Gondola Detailed Design and Construction REV1.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

NOAA SHIP NANCY FOSTER

(R-352)
30JUL2026

MED/KRZ

SONAR GONDOLA DETAILED DESIGN AND FABRICATION REQUIREMENTS

1.0

ABSTRACT

1.1 This specification describes requirements for detailed design of a sonar gondola, fabrication of sonar gondola, engineering for removal of existing blisters and other related engineering tasks.
2.0

REFERENCES:

2.1 Kongsberg Gondola Feasibility Study Dated 28JUL2026

AF
T

2.2 Drawing NF-085-002 REV G, NOAA Ship NANCY FOSTER Docking Plan

2.3 Drawing NF-085-001, General Arrangement

2.4 NOAA Standard Specification 0000.0 GENERAL REQUIREMENTS FOR SHIP

REPAIR CONTRACT WORK ON NOAA VESSELS

2.5 Shell Expansion Drawings

R

2.6 Port and Starboard ‘Blister’ Installation drawings.

ITEMS LOCATION/DESCRIPTION:

3.1

Affected Transducers:

3.1.1 EM2040 TX, 0.7deg

3.1.2 EM2040 RX, 0.7deg MkII

3.1.3 Teledyne Reson SVP-70

3.1.4 EM712 TX, 0.5deg

3.1.5 EM712 RX, 1.0deg

3.1.6 Teledyne Reson SVP-70

3.1.7 EK80 38kHz

3.1.8 EK80 70kHz, ES70-7C

3.1.9 EK80 120kHz, ES120-7C 312-204022

3.1.10

EK80 200kHz, ES200-7C 312-200841

3.1.11
ADCP, Teledyne RDI, Ocean Surveyor 150kHz, model 71A1023-00 3.1.12
Knudsen 3200chirp, 12kHz, part KEL-922
3.1.13
Knudsen 3200chirp, 200kHz, part KEL491-200kHz
3.1.14
Furuno DS6030-30 (‘speed log’)
3.1.15
Furuno FE800 50kHz, part 50B-6B
3.1.16
Furuno FE800 200kHz, part 200B-8B

GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICE:

D

3.0

4.0

NOAA SHIP NANCY FOSTER

(R-352)
30JUL2026

MED/KRZ

SONAR GONDOLA DETAILED DESIGN AND FABRICATION REQUIREMENTS

4.1 None

5.0

NOTES

5.1

Target completion of new gondola: 1OCT2027

5.2 Target installation of new gondola by shipyard is during new scheduled dry docking during Q1 FY28.

AF
T

5.3 Port and Starboard sonar ‘blisters’ were installed in 2011. Refs 2.6 contain detailed information about these installations. 6.0

QUALITY ASSURANCE: NONE ADDITIONAL

7.0

STATEMENT OF WORK REQUIRED:

D

R

7.1 Perform detailed design of sonar gondola based on findings in ref 2.1.
7.1.1 Design shall incorporate all sensors listed in section 3.1.
7.1.2 Design shall incorporate allowances for future upgrades of transducers.
7.1.3 The design shall not exceed the minimum dimensions shown in ref 2.1 for extent below the baseline to ensure draft impact is minimized.
7.1.4 Consult as necessary w/ OEMs and NANCY FOSTER Survey department personnel:

7.1.4.1 Kongsberg POC – Travis Eliasen

([email protected])
7.1.5 Design shall be of sufficient detail such that a 3rd party fabrication contractor can successfully construct
gondola. Contact OEMs as necessary to obtain dimensions

The beginning of the document. Download the full file to read on.