Scope of Work
Indian Health Services
Inscription House Health Center
Tonalea, AZ
19-unit Apartment Construction
Project No. NA23KA190Q7

1. PROJECT BACKGROUND:

1.1. The objective of this project is to construct an existing design of 19 unit apartment building to a new location while ensuring compliance with all applicable local building codes and regulations. The site adaptation will involve necessary adjustments to the architectural, structural, mechanical, electrical, and plumbing systems, as well as site-specific considerations for landscaping and parking.

2. SITE LOCATION:

2.1. 516 E Indian Rte 6290, Tonalea, AZ 86044

3. WORK COVERED BY CONTRACT DOCUMENTS:

3.1. The General Contractor (GC) shall furnish all personnel, material, services, and facilities to perform all work necessary described in construction drawings and specifications. 3.2. The technical attachments applicable to this project are provided in accordance with Section J. - J02 iHouse Apt 01 Phase 4 BOD
- J03 iHouse Apt 02 Phase 4 Drawings
- J04 iHouse Apt 03 Phase 4 Specifications

4. PERIOD OF PERFORMANCE: 365 days

5. WORK HOURS:

5.1. All site work shall be performed between 8:00AM and 4:30PM, Monday through Friday. As authorized by Contracting Officer work outside of those hours shall be performed if approved to minimize disruptions to patient care services. Additional costs will be approved by the Contracting Officer before work is done

6. CONTRACTORS USE OF SITE AND PREMISES:

6.1. Restricted Use of Site: Contractor shall have limited use of Project site for construction operations as indicated on Drawings by the Contract limits and as indicated by requirements of this section.
6.2. Safety and security of the contractor’s equipment will be the responsibility of the contractor.

7. SUBMITTALS:

7.1. The contractor will provide a complete schedule prior to issuance to Notice to Proceed (NTP). 7.2. The contractor submittals shall include shop drawings, product data, samples, facility user manuals, design submittals, inspection and testing reports, mock-ups, operation and maintenance manuals.
7.3. The contractor shall maintain copies of all submittals and their responses.

8. COORDINATION WITH OCCUPANTS:

8.1. Full Owner Occupancy: Owner will occupy site and adjacent room(s) during entire construction period. Coordination shall go through the COR during construction operations to minimize conflicts and facilitate owner usage. Perform the work so as not to interfere with owner's dayto-day operations. Maintain existing exits unless otherwise indicated.