Home / Multi-Site Indirect Fire (IDF) Concrete Bunker Construction… / Document

Statement of Work Israel BLS Bunkers

Updated

A PDF document (849 KB) attached to Multi-Site Indirect Fire (IDF) Concrete Bunker Construction & Installation, from the Department of the Army. Due Nov 25, 2026, 3:00 PM (UTC-5).

File name: SOW_Israel_BLS_Bunkers.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Statement of Work
Israel BLS Bunkers

Israel

As of 12 November 2026

ASG-J Directorate of Public Works // Israel BLS Bunkers // FY27

Points of Contact
Statement of Work Preparer:
CPT Jakeisha S. Harrison
Deputy Director Public Works
ASG Jordan
DSN: 318-820-6031
Email: [email protected]
DPW Reviewer
MAJ Joseph T. Schmuelling
Director Public Works
ASG Jordan
DSN: 318-820-6002
Email: [email protected]

ASG-J Directorate of Public Works // Israel BLS Bunkers // FY27

Israel BLS Bunkers

PART I – General Requirements

1. General Requirements.
1.1.

For the purposes of this document, United States Government (USG) refers to the United States Government and the Department of Public Works (DPW) or their designated representative. Contractor refers to the Contractor, Subcontractor, Contractor and Subcontractor employees, personnel, tools, and equipment. This document provides a general overview of the scope of work to be performed in accordance with USG and Israeli administrative codes, in addition to Israel and local government administration codes and generally accepted engineering and construction practices.

1.2.

The Contractor shall provide all management, tools, equipment, transportation, supervision and labor necessary to construct 10 new bunkers in Israel. The Contractor shall construct and install bunkers IAW the provided preliminary design and this Statement of Work (SOW). Reference photograph and provided preliminary drawings for specific locations of this SOW.

1.3.

Contractor shall perform all work in accordance with this SOW. Contractor shall coordinate all work with the DPW and is subject to the work schedule as stated in this document and the delivery schedule contained in the contract. Contractor shall be solely responsible for receiving any permits necessary with cost for the completion of the facility to include connecting to base electrical, water, and sewer. Contractor is responsible for submitting a 60%, 90% and 100% designs during the planning, designing and construction phase. Additionally, the contractor must submit project as built including all related completed delivered tasks with operational manual, guidance, warranty and all related documents.

1.4.

The Contractor shall be solely responsible for meeting all Israel construction codes. Additionally, the Contractor shall be solely responsible for complying with the International Building Code (IBC) and all referenced standards throughout this SOW. When two codes

The beginning of the document. Download the full file to read on.

Other documents in this bid