Statement of Work (SOW) for the Replacement of Three Roll-Up Garage Doors at the Kooskia National Fish Hatchery, Idaho

1. Scope of Work

The contractor shall provide all labor, materials, equipment, and supervision necessary to remove three existing roll-up garage doors and install three new sectional overhead doors. Work includes demolition, disposal, installation, adjustments, testing, and site cleanup. Two additional electric door operators shall also be installed as described in Section 3.

2. Technical Requirements

2.1 Door Specifications

•

Quantity: Three sectional overhead doors

•

Sizes:

•

o

One door approximately 8' 4" × 8' 7"

o

Two doors approximately 10' 2" × 10' 1"

Measurement Disclaimer:
o

All measurements provided are approximate.

o

All vendors must perform a mandatory on-site visit and confirm all dimensions independently.

o

The Kooskia National Fish Hatchery is not responsible for any measurement discrepancies or errors discovered after bidding or installation.

2.2 Door Construction Requirements

•

Ribbed steel panel design, white finish

•

Minimum 0.015" thick hot-dipped galvanized exterior steel

•

CFC-free polyurethane foam insulated core

•

Five sections per door

•

Bottom weather seal required

•

Galvanized steel hardware

•

2" track, 12" radius, angle-mounted

•

Torsion spring system (minimum 10,000 cycles)

•

Manual push-up operation

•

Non-rated wind load unless otherwise specified by contractor

2.3 Additional Work

•

Replace side seals on existing doors as needed

•

General preventative maintenance services for up to ten additional roll up garage doors included in this solicitation

3. Electric Door Operators

3.1 Maintenance Shop – Bay #1

•

Install one (1) 120vac electric door operator on the existing roll-up door in Bay #1 of the maintenance shop.

•

Operator must be appropriately sized for the door’s weight and lift characteristics.

•

Include wall-mounted controls and required safety features.

•

Electrical wiring arrangements shall be coordinated with facility staff.

3.2 Equipment Building – East-Facing Door

•

Install one (1) 120vac electric operator on the new East-facing roll-up garage door in the equipment storage building.

•

Provide compatible hardware, controls, and safety systems.

•

Coordinate electrical needs with facility staff.

4. Installation Requirements

•

Contractor must verify all field measurements and conditions before ordering materials.

•

All pad surfaces must be flush with jambs.

•

Contractor is responsible for the removal and disposal of old doors and debris.