Home / SSDG Engine Bergen Air Distributor / Document

Statement of Work NO 2 SSDG ENGINE AIR START

Updated

A Word document (42 KB) attached to SSDG Engine Bergen Air Distributor, from the Department of the Navy. Due Nov 6, 2026.

File name: SOW NO 2 SSDG ENGINE AIR START.docx

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

ABSTRACT

This item describes the requirement to provide the OEM technical services for starting air system.

REFERENCES/ENCLOSURES

References
Tech Manual T9311-CL-MMC-020, Generator, Diesel, Ship's Service, Model: TAO205-B3240L8/B1207_99/B0104117, Volume 2 Enclosure
Diesel Engine Maintenance Start-up and Dormant Start-up Readiness Assessment

ITEM LOCATION/DESCRIPTION

Location/Quantity
Location: Main Machinery Room (5-193-0), 3rd Platform FR 216. Quantity: No. 2 Ship Service Diesel Generators
Item Description/Manufacturer's Data
Manufacturer: Bergen Diesel
Model: KVGB-16
Type: 16 Cylinder
RPM: 900
SSDG No. 2 Pilot Air Start Distributor
Pilot Air Start Distributor: Drawing No. 662/12

GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: NONE

NOTES

Period of Performance: 09 to 13 NOV 2026.
Location: Naval Operations, Norfolk, VA Pier to be determined. Contractor to provide the services of ABS to witness and certify all repairs to the shop overhauled unit. MSC INFO: No 2 SSDG unable to blow down. Disk was worn, and it was incorrectly timed.

NOT USED

STATEMENT OF WORK REQUIRED

Coordinate with Ship’s Force to lock out and tagout all required systems and equipment. Drain and dispose of any liquid in accordance with all federal, state and local regulations. Provide services OEM authorized representatives to troubleshoot the air starting system for unit specified in paragraph 3.0. Remove and replace air start distributor with new GFM component listed in paragraph 3.2.2.a. Commission unit in accordance with reference 2.1. Existing Unit: Convey to repair facility.
Dissemble and clean, take and record all clearances. Provide report of “as found condition” to include all part descriptions, part numbers, quantities, and photos. If repairs are deemed necessary, a change order (CCO) will be issued to this contract. Re-assemble and bench test, replacing all gaskets, o-rings, and seals. Provide a “Final Report” to the Government.
Crate and return to ship.
Inspection/Test
Complete a performance test.
ABS is to witness open, inspect and all testing.
Reports
Provide report of finding and recommended repairs.
Manufacturer's Representative
Provide the services of an OEM authorized field service representative to accomplish all work and testing on the diesels identified in Paragraph 3.0 ensuring compliance with the manufacturer’s standards and performance specifications. Possible SourceAdel Mousa Defense & Development Program Manager Member Of MSHSPhone: 954-763-3660 – Ext 9952;Direct Line: 1(954)425-9952 Cell: 1(954)648-6189Toll Free :(800) 622-6747 Fax: 954-763-2872E-Mail: [email protected]

The beginning of the document. Download the full file to read on.

Other documents in this bid