Home / Re-Activation of Snake River Water Pump / Document

STATEMENT OF WORK- Re-Activiation of Snake River Pump

Updated

A PDF document (359 KB) attached to Re-Activation of Snake River Water Pump, from the Department of the Air Force. Due Nov 30, 2026, 10:00 AM (UTC-7).

File name: STATEMENT OF WORK- Re-Activiation of Snake River Pump.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

STATEMENT OF WORK (SOW)

RE-ACTIVATE SNAKE RIVER WATER

TRANSMISSION SYSTEM (WTS) INTAKE PUMP

STATION & PIPELINE

366th Civil Engineer Squadron (366 CES)
Mountain Home Air Force Base, Idaho
Date: 13 October 2026

CHANGE LOG

Revision

Date

Author

Page #’s
Affected

Description of
Change(s)

1.0 INTRODUCTION

2.0 TOPOGRAPHICAL INFORMATION

3.0 PERIOD OF PERFORMANCE (POP) & SCHEDULE

4.0 SCOPE OF EFFORT

•
•
•
•

4.1 General Requirements & Technical Qualifications

4.2 Pre-Activation Inspection & System Verification

4.3 Penstock Flushing

4.4 Mechanical & Fluid System Re-Commissioning

4.5 Coordination with Water Treatment Plant (WTP) Contractor (RSCI) & Controls Interface
• 4.6 3.5-Million-Gallon Continuous Flow Demonstration & Pumping Operations
• 4.7 Operations Flight (366 CEO) Training, Witnessing & Formal Turnover

5.0 REQUIREMENTS & SUBMITTALS

• 5.1 General Requirements
• 5.2 Environmental Protection & Waste Management (Section 01 57 19)
• 5.3 Safety & Health Compliance (EM 385-1-1 / OSHA)

6.0 GENERAL PROVISIONS

•
•
•
•
•

•

•

•
•
•

7.0 APPLICABLE CODES, STANDARDS & REFERENCES

8.0 SPECIAL CONSIDERATIONS & SITE-SPECIFIC CONSTRAINTS

APPENDIX A – EQUIPMENT SCHEDULE & TECHNICAL REFERENCE

•

APPENDIX B – DRAWINGS, AS-BUILTS & SCHEMATIC REFERENCES

DATA

1.0 INTRODUCTION

1.1 The United States Government (USG) has a requirement for specialized mechanical, civil, and industrial water systems services at Mountain Home Air Force Base (MHAFB) and associated off-base utility corridors in Elmore and Owyhee Counties, Idaho.
1.2 The contractor shall furnish all management, licensed professional personnel, specialized labor, equipment, tools, testing apparatus, materials, transportation, and incidentals necessary to inspect, re-activate, test, and demonstrate the operational readiness of the State-constructed Snake River Water Transmission System (WTS) Intake Pump Station and associated 14.5-mile raw water transmission pipeline. 1.3 System re-activation focuses strictly on the core water conveyance infrastructure to include but not limited to: the intake structure, raw water pumps, surge vessel, pneumatic charging system, primary pipeline control and relief valves, high-point air valves, and main electrical switchgear. SCADA programming and network telemetry integration between the pump station and the on-base Water Treatment Plant (WTP) will be performed separately by the WTP construction contractor (RSCI) and base personnel.
1.4 Upon completion of the required functional equipment testing, pipeline filling,

The beginning of the document. Download the full file to read on.

Other documents in this bid