Statement of Work Redacted
Updated
A PDF document (688 KB) attached to Diesel Injection Pumps, from the Department of the Navy. Due Oct 26, 2026, 12:00 PM (UTC-7).
File name: A5 SOW Redacted.pdf
The full file is for paid members, or buy this bid alone.
Preview
Fuel Pump Refurbishments (16) ea.
Statement of Work (SOW)
1. BACKGROUND: The Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS&IMF) in support of
requires OEM
to complete technical refurbishment services to (16) ea. fuel pumps. 1.1. Scope: Complete evaluation, refurbishment and testing of (16) ea. fuel pumps to OEM
specifications.
2. REFERENCES:
2.1.
Northwest Regional Maintenance Center (NWRMC) Local Standard Items 099-12NW(FY26)
2.2.
S9312-AH-MMA-20, Emergency Diesel Submarine Technical Manual
2.3.
OEM Fuel Injection Pump Calibration Manual
2.4. PMS MRC 6FNZ, Test Fuel Injection Nozzles
3. REQUIREMENTS:
3.1. Period of Performance:
3.1.1.
11/16/26-09/30/28
3.1.1.1. Fuel Pumps 11/16/26-02/19/27
3.1.1.2. Shipboard work 03/08/28-/04/08/28
3.2. Government Point of Contact:
3.2.1.
Contracting Officer’s Representative (COR) will be identified in the contract.
3.3. Security Requirements:
3.3.1.
Level of Facility Security Clearance (FCL) Required: Confidential.
3.3.2.
Level of Safeguarding for Classified Information/Material Required at Contractor Facility: Confidential.
3.3.3.
Restricted Data: Contractor personnel require access to and control of Restricted Data (RD), regarding Naval Nuclear Propulsion Information (NNPI and U-NNPI), to accomplish the requirements of this contract. Safeguarding of NNPI and U-NNPI shall be per the requirements of OPNAVINST N9210.3. Contractor personnel will require access to machinery room at PSNS & IMF aboard the
inside
the CIA.
3.4. Comply with the requirements of reference 2.1. Contractor will provide all tools, parts, test equipment, consumables, including hazardous materials, personnel, labor, technical expertise, and Personal Protective Equipment (PPE) to accomplish actions listed in section 1.1 using reference
Section C:
Fuel Pump Refurbishments (16) ea.
Statement of Work (SOW)
3.5. The contractor shall attend a post award conference convened by the Contracting Officer (KO) within ten business days of contract award.
3.5.1.
The conference may be held in person at PSNS & IMF or virtually via a Government approved platform, at the discretion of the Government.
3.6. Attend an arrival and safety brief with project team and COR – required for all contractor and subcontractor personnel upon arrival.
3.7. Coordinate delivery and shipment of Contractor equipment and supplies with the COR: 3.7.1.
Government Delivery and Shipping Address:
3.8. Safety:
3.8.1.
Safety-Mishap Notification and Investigation: Notify (via telephone) the
The beginning of the document. Download the full file to read on.