Home / Intent to Sole Source - Rohde & Schwarz USA, Inc. / Document

Statement of Work Rohde Schwarz - Redacted Copy

Updated

A PDF document (273 KB) attached to Intent to Sole Source - Rohde & Schwarz USA, Inc., from the Department of the Navy. Due Nov 20, 2026, 9:00 AM (UTC-5).

File name: SOW Rohde Schwarz - Redacted Copy.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

This equipment is not to be altered in any manner that affects its operating characteristics, controls, or external connections (if applicable). Normal adjustments required to bring the item into specification limits are permitted.
Calibration must be traceable to the one of the following via an unbroken chain of measurements: -The National Institute of Standards and Technology
-Natural Physical Constants (Intrinsic Standards)
-Consensus Standards
-National Standards of other countries which are correlated with U.S. National Standards The calibration process used must result in a Test Accuracy Ratio or Test Uncertainty Ratio of 4:1 or greater, or a False Accept Risk of 2% or less, in accordance with the applicable paragraph(s) of ANSI/NCSL Z540.1 or later.
“As found” and “as left” measurement values are required on the certificate of calibration. Any deviation from the criteria mentioned in this section must be authorized by NNSY Code 137.2, Metrology Engineering. Use of a different vendor other than Rohde & Schwarz. must also be researched and approved by NNSY Code 137.2 Metrology Engineering. Repair Work Requirements
Repairs may be necessary, but the extent of repairs will be unknown prior to the maintenance and calibration work defined in the statement of work. If it is discovered that repairs are needed, the contractor shall immediately provide a cost breakdown, (e.g. materials, labor, and travel) to the KO and TPOC for evaluation. Additional price information may be requested by the KO if needed to determine the repair work’s price is fair and reasonable. Any repair work will be issued on CLIN separately funded line item. No additional repair work will be authorized until funded by way of modification. Repair work is hereby determined to be within the scope of this contract; however, the KO shall make a separate scope determination based on the extent of repairs needed and determination of fair and reasonableness.
2.1 Security NNSY Access Requirements: All contractors, with the exception of permanent party (or “seated” contractors with Common Access Cards (CACs), will be required to obtain a DBIDS card to gain access to NNSY.
(Note: A “seated contractor” is a contractor who received CACs and are granted access to Navy or NNSY information technology systems and are stationed at NNSY as their permanent work location.) • Procedure for receiving a DBIDS card:
a) Contractor will complete the SECNAV 5512 form(s) and forward them to their NNSY

The beginning of the document. Download the full file to read on.

Other documents in this bid