SCOPE OF WORK

U.S. COAST GUARD

AIRSTATION PORT ANGELES

Fire Suppression Tests for Multiple Facilities at CG Air Station Port Angeles

SECTION 1 – GENERAL INFORMATION

1.1 BACKGROUND

Annual inspection, testing, and maintenance of the fire protection systems is needed for multiple facilities located at USCG AIRSTA Port Angeles.

1.2 SCOPE

The contractor must provide all personnel, equipment, transportation, tools, materials, supervision, and other items and services necessary for inspection, testing, and maintenance of fire protection systems in multiple buildings, including an aircraft hangar, in accordance with NFPA 11, NFPA 25, NFPA 70, NFPA 72, and NFPA 80.

1.2.1 Primary Point of Contact/Technical Representative:

Name: DCC Jeremiah Randolph
Phone: 808-346-9579
E-mai: [email protected]

1.2.2 Alternate Point of Contact

Name: LT Alexander Macleod
Phone: 808-647-0261
E-mail: [email protected]

SECTION 2 – SPECIFIC REQUIREMENTS/TASKS

2.1 GENERAL

The contractor must provide all personnel, equipment, transportation, tools, materials, supervision, and other items and services necessary for inspection, testing, and maintenance of fire protection systems in multiple buildings, including an aircraft hangar, in accordance with NFPA regulations. Please see Enclosure 1 for further details.

2.2 TASKS

•

Contractor shall provide all personnel, equipment, tools, materials, supervisor, and other items and services necessary to conduct (please see Enclosure 2 for additional fire system details): o Clean Agent Systems Testing per NFPA 2001 (2 Units)
o Fire Extinguisher Annual Service as per NFPA 10 (93 Units) o Wet Fire Sprinklers Annual Inspections per NFPA 25 (5 Units) o Dry Sprinkler Annual Inspections per NFPA 25 (1 Units) o Annual Fire Alarm Confidence Test per NFPA 72 (8 Units) o Annual Fire Pump Testing per NFPA 20 (1-Diesel, 1-Electric) (2 Units) o Dry Chemical Automatic Fire Systems per NFPA 17 (3 Units) o One Year Internal Pipe Inspections per NFPA 25, 403, (6 Units) o Semi-annual and annual inspections on Halon Systems (2 Units) o Annual testing of fire panels (10 units)

•
•
•

Contractor shall perform a final inspection and operation test in the presence of the POC to ensure the system performs to the manufacture’s specification. Contractor shall provide records of inspection, tests, and test results to the unit, as well as a list of all discrepancies.
Contractor shall complete all work, deliverables and outcomes within 45 calendar days after