Home / Ca-Humboldt Bay Nwr-Tide Gate Repair / Document

Statement of Work Sheldon Wood Stove 2

Updated

A PDF document (645 KB) attached to Ca-Humboldt Bay Nwr-Tide Gate Repair, from the Departmental Offices. Due Nov 13, 2026, 5:00 PM (UTC-8).

File name: A04_SOW_Sheldon_Wood_Stove_2.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

STATEMENT OF WORK

Install Wood Stove in Manager’s Quarters – Sheldon National Wildlife Refuge July 16, 2026
1) General:
The U.S. Fish and Wildlife Service requires a contractor to furnish all labor, materials, supervision, equipment, permits, transportation, and incidentals necessary to install a complete mobile home compliant wood-burning stove system in an existing government quarters (modular). All work shall comply with NFPA 211, applicable International Residential Code provisions, OSHA requirements, manufacturer installation instructions, and applicable federal, state, and local codes. Contractor shall verify existing conditions prior to bidding. The wood stove is a Jotul F035 mobile home compliant model and furnished by the government (only the wood stove).
A. Contractor Qualifications: Contractors must have demonstrated prior experience installing and wood stoves. Contractor shall be licensed and comply with OSHA requirements. Contractor shall provide evidence of licensing and insurance upon request. B. Standards: All work shall comply with applicable building codes, manufacturer installation requirements, OSHA regulations, and applicable federal requirements. The wood stove shall be installed in accordance with industry best practices and standards. C. Photographs of the area of installation are included. A pre-bid meeting will be held on TBD. For questions or additional information, see Refuge Contact Information. 2) Place and Period of Performance
A. Place of Performance: Sheldon National Wildlife Refuge, 44280 Virgin Valley Road, Denio, NV 89404.
B. Period of Performance: Notice to Proceed + 120 days
C. Normal Duty Hours Monday thru Friday 7:00am-4:30pm
D. Non-duty hours include weeknights, weekends, and Government holidays (New Year’s Day, Memorial Day, President's Day, Juneteenth, Fourth of July, Thanksgiving, Columbus Day, Christmas).
3) Scope
A. Contractor shall Provide a complete installation including all mobilization and preparation; installation of EPA-certified wood stove compliant with modular homes; chimney system; insulated chimney pipe; flashing; chimney cap and spark arrestor; hearth pad; wall protection; roof penetration; roof completion, finishing and sealing; smoke and carbon monoxide detectors as required by code; testing; cleanup; and coordination of required inspections.

4) Deliverables and/or Delivery Schedule
A. The following deliverables shall be required:
a. Detailed breakdown of fees and costs to accomplish the work in accordance with the

The beginning of the document. Download the full file to read on.