Statement of Work SOS
Updated
A PDF document (369 KB) attached to Two (2) Plastic Media Blast Booths, from the Defense Logistics Agency. Due Nov 19, 2026, 11:59 PM (UTC-5).
File name: 335_SOW_SOS.pdf
The full file is for paid members, or buy this bid alone.
Preview
PURCHASE DESCRIPTION FOR THE ACQUISITION OF
TWO PLASTIC MEDIA BLAST BOOTHS
SCOPE.
The content of this specification describes the minimum requirements for the procurement, delivery, site preparation, installation, integration, and commissioning of two (2) separate, independent, and equal-sized new Plastic Media Blast (PMB) booths for the Fleet Readiness Center, Southwest (FRCSW) in the Building 472 Blast Shop.
This procurement is structured as a full turn-key assembly. The Contractor shall assume single-point responsibility for delivering two completely functional, integrated, and ready-to-operate blast booths. The scope of this turn-key procurement includes, but is not limited to:
•
•
•
•
•
•
Decommissioning, structural dismantling, removal, and disposal of designated existing blast booths and associated utilities.
Comprehensive site preparation, including subsurface utility scanning, concrete foundation modifications, anchoring, leveling, and floor restoration. Engineering design, fabrication, supply, and delivery of all system structures, ducting, and components.
Rigging, structural assembly, mechanical installation, and routing/connection of all electrical, pneumatic, and environmental subsystems.
E-stop capabilities to ensure that the equipment shutdown can take place in the event the fire alarm goes off.
Site acceptance testing, system-wide commissioning, compliance certifications, training of operators and maintenance technicians, and a single, unified system.
The blast booths shall be designed for the mechanical surface preparation/cleaning of various aircraft components, utilizing PMB technology. Upon final handover, the booths must be fully operational and ready for immediate production. REQUIREMENTS.
Design.
The equipment offered shall be new and a current commercially available model. Prototype units, pre-production models, or experimental units do not qualify as meeting the requirements specified herein. The machine shall include all components, parts, and features necessary to meet the performance requirements specified herein. All parts subject to wear, breakage, or distortion shall be easily accessible for adjustment, replacement, and repair.
Measuring and Indicating Device Graduations. All measuring and indicating devices on the machine shall be graduated using inch and pound units of measurement. Controls. All electrical, mechanical, hydraulic, and pneumatic operating controls shall be located convenient to the operator's workstation(s).
The beginning of the document. Download the full file to read on.