Home / FCI Englewood - Dish Machine - 26Z4AV7 / Document

Statement of Work-Specifications

Updated

A PDF document (264 KB) attached to FCI Englewood - Dish Machine - 26Z4AV7, from the Federal Prison System / Bureau of Prisons. Due Nov 12, 2026, 2:00 PM (UTC-5).

File name: 3. SOW-Specifications.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

U.S. Department of Justice
Federal Bureau of Prisons
Facilities Management
Wash ington, DC 2053./

October 2 1, 2026

MEMORANDUM FOR JOSEPH SMITH, FACILITY MANAGER

FC I Englewood

KI MB ER Ly

HUDSON

Digita ll y signed by

KIM BERLY HUDSON

Date: 2026.10.22
10:10:25 -04'00'

FROM :

Ki mberl y Hudson, Chief
Construction and Environmental Rev iew Section

SUBJECT:

Statement of Work Approval
26Z4A V7, Upgrade FS Kettles and Di sh Machine

The Faci lities Management Branch, Construction and Environmental Review Section, has reviewed and approved the Statement of Work for so licitation services at FCI Englewood for project 26Z4A V7, Upgrade FS Kettles and Dish Machine. No additional square footage or modifications to the primary structure are associated with this project. If you have any additional questions or concerns, please reach out to Construction and Environmental Review Section to [email protected]

Cc: Regional Faci li ties Administrator

PFEDERAL BUREAU OF PRISONS

FCI ENGLEWOOD

PROJECT 26Z4AV7 UPGRADE FS KETTLES AND DISH MACHINE

(FS KETTLES IS A FBOP IN-HOUSE PROJECT AND NOT PART OF THIS SOW)

KIMBERL y

HUDSON

Digita lly signed by

KIMBERLY HUDSON

Date: 2026.10.22
10:10:42 -04'00'

STATEMENT OF WORK

PART I: GENERAL REQUIREMENTS & TECHNICAL SPECIFICATIONS

A. INTRODUCTION & PROJECT OBJECTIVES

1.

The Federal Bureau of Prisons (FBOP), Federal Correctional Institution (FCI) Englewood, located at 9595 W. Quincy Avenue, Littleton, CO 80123, intends to make a single award to a qualified contractor to provide all equipment, labor, materials, and incidentals requ ired to modernize its food service operations . The primary scope entails the removal of the existing institutional dis hwashing hardware and the procurement, installation, and integration of a high-efficiency re placement system .

2.

All project executions, materia l supply, procurement, and contracting activities sha ll comply with applicable Federal, State, and local regulations, codes, and standards. The contractor must be a reputable, duly licensed firm with verifiable experience in high-volume commercial food -service infrastructure.

B. STANDARDS AND CODE COMPLIANCE

All work, engineering controls, material s, and insta ll ations performed under this contract shal l strictly adhere to the latest ed ition s of national, state, and local codes . Where differences exist between the referenced requirements, the most stringent criteria shall govern . Key compliance mandates include, but are not limited to:

The beginning of the document. Download the full file to read on.

Other documents in this bid