Home / Intent to Sole Source: Seawolf Class Emergency Propulsion… / Document

Statement of Work SSN 21 EPM CASREP Redacted

Updated

A PDF document (184 KB) attached to Intent to Sole Source: Seawolf Class Emergency Propulsion Motor, from the Department of the Navy. Due Nov 12, 2026, 12:00 PM (UTC-8).

File name: SOW SSN 21 EPM CASREP 110526_Redacted.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Section C:
Emergency Propulsion Motor

STATEMENT OF WORK (SOW)

1. BACKGROUND: The Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS&IMF) in support of Seawolf class submarine
requires Amee Bay to
complete industrial cleaning services to the Emergency Propulsion Motor (EPM)

1.1. Scope: Industrial Cleaning of the EPM Stator and Rotor to OEM specifications.

2. REFERENCES:

2.1. Northwest Regional Maintenance Center (NWRMC) Local Standard Items 099-12NW(FY26) 2.2.

NAVSEA S0400-AD-URM-010/TUM Rev-08 – Tag-out User’s Manual

2.3. Maintenance Standard 2390-081-020 Rev - Chg. 3, Restore Emergency Propulsion motor

3. REQUIREMENTS:

3.1. Period of Performance:

3.1.1.

3.2. Government Point of Contact:

3.2.1.

COR will be identified in the contract.

3.3. Security Requirements:

3.3.1.

Level of Facility Security Clearance (FCL) Required: Confidential.

3.3.2.

Level of Safeguarding for Classified Information/Material Required at Contractor Facility: Confidential.

3.3.3.

Restricted Data: Contractor personnel require access to and control of Restricted Data (RD), regarding Naval Nuclear Propulsion Information (NNPI and U-NNPI), to accomplish the requirements of this contract. Safeguarding of NNPI and U-NNPI shall be per the requirements of OPNAVINST N9210.3. Contractor personnel will require access to Engine Room at PSNS & IMF Service Pier

3.4. Comply with the requirements of Item No. 099-012NW per reference 2.1. Contractor will provide all tools, parts, test equipment, consumables, including hazardous materials, personnel, labor, technical expertise, and Personnel Protection Equipment (PPE) to accomplish actions listed in section 1.1

Section C:
Emergency Propulsion Motor
3.5. The contractor shall attend a post award conference convened by the Contracting Officer (KO) within ten business days of contract award.
3.5.1.

The conference may be held in person at PSNS & IMF or virtually via a Government approved platform, at the discretion of the Government.

3.6. Attend an arrival and safety brief with project team and Contracting Officer’s Representative (COR) – required for all contractor and subcontractor personnel upon arrival. 3.7. Coordinate delivery and shipment of Contractor equipment and supplies with the COR: 3.7.1.

Government Delivery and Shipping Address:

3.7.2.

3.8. Safety:

3.8.1.

Safety-Mishap Notification and Investigation: Notify (via telephone) the cognizant COR and project within four hours of all contractor mishaps or incidents. If requested by the cognizant COR and/or Project, the contractor shall

The beginning of the document. Download the full file to read on.