STATEMENT OF WORK (SOW)
FOR
USCGC SMILAX Crane Service
SMILAX bent a support lattice on the CG300 crane and is in need for rental crane services for tasks outlined in this Statement of Work (SOW).
1.0 GENERAL
1.1 BACKGROUND
The 100' WLIC asset, USCGC SMILAX, has a bent the lattice on the upper section of the CG300 and requesters a crane and qualified rigger that can lift the boom off to the pier and replace it with a new 8500 LB 720in x 70inx 70in boom section being provided by Sparrows.
1.2 SCOPE
The scope of this contract is defined by the efforts and tools required to support USCGC SMILAX. The Contractor shall provide all labor, materials, and tools necessary to lift, up to 8500 lb boom off the Cutter and back onto the Cutter
Diminsions
Boom stop -1000 lb 240in x 10in x 10in
Boom - 8500 LB 720in x 70inx 70in
1.3 OBJECTIVE
The goal is to return CGC SMILAX CG300 to designed system parameters.
1.4 APPLICABLE DOCUMENTS
1.4.1 Compliance Documents
The following documents provide specifications, standards, or guidelines that must be complied with in order to meet the requirements of this contract:
2.0 SPECIFIC REQUIREMENTS/TASKS
Unless otherwise stated, this contract applies to on-site support for USCGC SMILAX in Atlantic Beach, NC
2.1 Boom lift - Remove boom from cutter.
The Contractor shall perform any inspections or evaluations, as deemed necessary, to determine best path forward prior to commencing work.
2.1.1 CGC SMILAX will remove all wire rope from boom before crane is onsight 2.1.2 The Contractor shall inspect, and follow best lifting procedures. 2.1.3 Crew will unbolt boom stops and boom and Contractors will lift boom stops then boom and place on pier.
2.1.4 CGC SMILAX will remove pins holding top boom section.
LAST UPDATED: 10/13/2026
2.1.5 Contractors will lift old boom section off and place new boom section in its place, where crew will attach sections together
2.1.6
The Contractor will lift boom back onto cutter where the crew will bolt it to the crane.
2.2 Test Thoroughly and Document
The Contractor shall ensure the system is fully functional by preforming a system operational test to be witnessed by Engineer Petty Officer (EPO) or the EPO’s designated representative. 2.2.1
The Contractor shall provide a trip report documenting all findings no later than 48 hours after returning to the home office.
3.0 CONTRACTOR PERSONNEL
3.1
The Contractor shall provide qualified personnel to perform all requirements specified in this SOW.
4.0 OTHER APPLICABLE CONDITIONS