Statement of Work Tohaali Sidewalk Replacement

Updated

A Word document (26 KB) attached to To'haali' School Replace Front Entrance Sidewalk, from the Bureau of Indian Affairs. Due Dec 14, 2026, 5:00 PM (UTC-7).

File name: A1_-_SOW_Tohaali_Sidewalk_Replacement_AB856959__090226.docx

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

New Mexico Navajo South Agency
Tohaali Community School – WO# AB856959
Highway 491, Route 19Newcomb, New Mexico 87455
Statement of Work (SOW)
09/02/2026
Concrete Sidewalk Demolition and Replacement

Overview
Tohaali Community School is in need of demolition and replacement of deteriorated and damaged concrete sidewalk sections located on the school campus. The existing concrete sidewalk is not ADA-compliant, has areas of cracking, spalling, settlement, deterioration, and/or other deficiencies that create uneven walking surfaces and may present trip hazards to students, faculty, staff, visitors, and school maintenance personnel. The purpose of this project is to remove the identified defective concrete sidewalk sections and replace them with new concrete sidewalks that provide a safe, ADA accessible, durable, level, and accessible pedestrian walking surface. The Contractor shall provide all labor, supervision, equipment, tools, materials, transportation, demolition, disposal, site preparation, concrete placement, finishing, curing, cleanup, and incidentals necessary to complete the project in accordance with this Statement of Work. The Contractor shall field-verify the existing sidewalk conditions, dimensions, quantities, elevations, drainage requirements, adjacent structures, utilities, and other site conditions prior to beginning work. The completed sidewalk shall provide a durable pedestrian surface and shall be properly integrated with existing sidewalks, curbs, entrances, drainage areas, and surrounding grades.

Scope of Work Requested
New Mexico Navajo South Facility Management intends to obtain the services of a qualified concrete contractor to demolish and replace designated deteriorated concrete sidewalk sections at Tohaali Community School. The Contractor shall furnish all labor, supervision, equipment, tools, materials, transportation, testing, quality control, disposal, and incidentals necessary to complete the work. The Contractor shall verify all existing field conditions and sidewalk dimensions prior to construction. Final quantities shall be based upon actual field conditions and the requirements identified by the Government. The work shall include, but not necessarily be limited to, the following: Mobilize to Tohaali Community School and coordinate the project with BIE Facility Management and school administration. Conduct a pre-construction site inspection and verify the location and extent of sidewalk replacement. Identify and protect existing utilities, structures, landscaping, irrigation systems, drainage features, curbs, ramps, doorways, and other adjacent facilities.