Home / J061 UPS and Battery Maintenance and Testing – Nashville VA… / Document

Statement of Work - UPS Testing - Nash Eng

Updated

A Word document (38 KB) attached to J061 UPS and Battery Maintenance and Testing – Nashville VA Medical Center, from the Department of Veterans Affairs. Due Nov 26, 2026, 12:00 PM (UTC-6).

File name: SOW - UPS Testing - Nash Eng.docx

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

STATEMENT OF WORK

Department of Veterans Affairs TVHS, Nashville Campus
Requirements for Service, Maintenance and Testing of UPS system

Introduction/Background Information
The UPS system is vital to the everyday operations of the Tennessee Valley Health System. The System must always be operational and maintained to the highest quality performance standards. This UPS system is critical to the care of our veterans and their families and friends. This Service shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to perform maintenance, troubleshooting, inspections, and testing of the UPS as stated in this Statement of Work (SOW). The contractor shall perform as to meet or exceed Standards in this contract.

Place Of Performance

Tennessee Valley HealthCare System 1310 24th Ave S.
Nashville, TN 37212

Scope Of Work

This SOW describes the requirements for Qualified Contract Professionals – known as “Contractors” in this document, hereafter. Contractors who are contracted by Veteran Affairs (VA) Medical Center to perform maintenance troubleshooting, testing and repair of the UPS, and all its components shall meet all requirements stated in SOW.

Work includes parts, installation of parts, troubleshooting onsite, and travel as required, including, but not limited to electrical, low voltage controls, programming, and certain other items. The contractor shall provide all tools, labor, material, equipment, and supervision necessary to perform all work as required by the contract documents for the following Line Items below:

Product DescriptionSerial Number

9390-100-120, VRLA Sealed, 40EC511CAB09 & EC512CAB05

Parts and Materials:

FL87NXDX-0160

Labor/ Services:

8 Hour Onsite Emergency Response Time

After Hours Support (24X7) w/ Parts and labor

30% Spare Part kit and Time and Material Discount

1x per term: Pre-Site Survey, After Hours (24X7) (0005NXXX-0160)

1x per term: UPS Preventative Maintenance, Any time (0005NXXX-0160)

3x per term: Sealed Battery Preventative Maintenance, any time (0005NSXX040)

1x Load Bank for UPS <100KW/480v or 80KW/208 Anytime During PM, 24x7 Labor (LB05NXPM100)

Requirements/Tasks

A complete written report of the work performed shall be provided to the VA within 10 (ten) working days of contract work completion. Information shown in the report should meet the following:

Company’s name, addresses, telephone, & fax numbers.

Name and signature of contractors who perform the maintenance and testing.

The beginning of the document. Download the full file to read on.