DEPARTMENT OF VETERANS AFFAIRS

STATEMENT OF WORK

Groundwater Remediation Contract
Background
In 2023, the VA found liquid in the secondary containment of its fuel dispensing station. Further investigation found evidence of contamination in the surrounding soil. See Attachment A, New Hampshire Department of Environmental Services (NHDES) Spill Reporting Form and Attachment B, 2023-04-05 Environmental Conditions report. Initial sampling, NAPL Delineation, installation of groundwater monitoring wells, groundwater sampling and analysis, and creation and submission of the Remedial Action Workplan were added to the design contract of an already-funded project to replace fuel storage tanks and remove the fuel dispenser. These items are all complete and the associated documentation is attached.
Removal of the contaminated soil and installation of remediation wells was included in the construction portion of the same funded project replacing the fuel storage tanks and removing the fuel dispenser. These items are also complete. Addressing the groundwater contamination through in situ product application, follow on groundwater monitoring, and creation and submission of the Remedial Implementation Report were not included in the funded project. The purpose of this contract is to complete the remaining remediation work and required New Hampshire Department of Environmental Services (NHDES) reporting.
Tasks
Note that tasks are listed such that the last items listed are the first ones to be completed and closed out on the contract, which is roughly in reverse chronological order. 3.1 Item 1 – Groundwater Testing and Monitoring (semi-annually every year) Conduct groundwater monitoring to document the effect of source removal and in-situ amendments on groundwater quality. Groundwater monitoring shall include level gaging, sampling, analysis, and recording of geochemical parameters. Provide the results of the monitoring, including a plain-language summary, analysis and copies of laboratory testing results, to the VA within 30 days of sampling.

Submit a Periodic Status Report, prepared in accordance with New Hampshire Env-Or 606.18, to the VA within 30 days of sampling. Once the VA has approved the report, submit the report to NHDES.
Sampling shall be conducted twice per year, once in the fall and once in the spring. The first sampling shall be completed as soon as contract is awarded. 3.2 Item 2 – Second In-Situ Remedial Product Application (BASE YEAR ONLY) Following NHDES approval of the Periodic Status Report submitted in Item 3, provide a

The beginning of the document. Download the full file to read on.