Home / MAPS RFP Draft 6 / Document

Summary of Changes to Draft 6

Updated

A PDF document (118 KB) attached to MAPS RFP Draft 6, from the Department of the Army. Due Dec 31, 2028, 5:00 PM (UTC-5).

File name: Summary of Changes to Draft 6.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Summary of Changes Draft 6 Sections C, G, H, I, L, and M Section C – Descriptions/Specifications/Work Statement
•
•
•

1.4.1 Quality Assurance removed.
5.0 Contract Deliverables updated with Service Contract Reporting 5.5 Performance Requirements Summary removed.

Section G – Contract Administration Data
•

G.4.5 Adjustment of Baseline Rates updated language.

Section H – Special Contract Requirements
•

H.1 Definitions: Updated definitions for: Joint Ventures, Mentor-Protégé JV, Populated JV, and Emerging Large Business and removed definition of Highest Rated Technical Offeror.

•

H.6 One Contract Per Entity: Updated the language.

Section L – Instructions to Offerors
•

L.1.1.2 Competition: Language added.

•

L.1.1.3 Joint Ventures: Added language regarding Joint Ventures.

•

L.2.1 Volume I – Cover Letter: Added Unique Entity Identifier (UEI)

•

L.2.2.2.1 Systems and Certifications: Removed Government Determined Acceptable Purchasing System and Government Determined Acceptable Accounting System from Small Business scoring.

•

L.2.3.2 QP Submissions: Added language allowing for submission of Technical Guidance Letters and to allow for the use of a QP where the prime performed as a subcontractor for Small Business, Emerging Large Business, and Commercial-Sector Vendor.

Section M – Evaluation Factors
•

M.1 Basis for Award: Added language stating Government reserves the right to upward or downward adjust the number of awards without limit. Updated language regarding awards to Commercial-Sector Vendors to say the Government may or may not reallocate the remaining

spots.

•

M.4 Evaluation of Systems and Certifications: Updated point allocations for Small Business to include points being allocated if not proposing as JV.

•

M.5.5 Dollar Value: Updated evaluated dollar value thresholds to state less than and greater than.

•

M.5.6 Passthrough Rate: Updated the passthrough rate calculation to provide additional clarity.

•

M.5.7.3 Schedule: Updated Outcome based QP language to clarify overall Project Schedule.

The beginning of the document. Download the full file to read on.

Other documents in this bid