SVC PACE Draft Statement of Work
Updated
A PDF document (373 KB) attached to System Vicarious Calibration (SVC) of the NASA Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) Ocean Color Instrument (OCI) Using HyperNAV, from the National Aeronautics and Space Administration. Due Nov 2, 2026, 11:59 PM (UTC-5).
File name: 80HQTR27R0004_SVC PACE_Draft SOW.pdf
The full file is for paid members, or buy this bid alone.
Preview
System Vicarious Calibration (SVC) of the NASA Plankton, Aerosol, Cloud, Ocean Ecosystem) PACE Observatory Using HyperNav
Statement of Work (SOW)
1. Scope of Work
This contract provides for operation and maintenance of the HyperNav hyperspectral radiometric system to support system vicarious calibration (SVC) of the NASA Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) Ocean Color Instrument (OCI).
2. Background
The HyperNav system was developed under NASA contract 80GSFC22CA050 (ROSES 2019, entitled A.48 The Plankton, Aerosol, Cloud, Ocean Ecosystem (PACE) Mission System Vicarious Calibration). The purpose of the contract was to develop, implement, and deploy in situ SVC capabilities for the Ocean Color Instrument, the primary instrument on the PACE mission. System vicarious calibration combines satellite sensor data with in situ radiometric measurements to determine on-orbit calibration factors, requiring high-accuracy, hyperspectral-resolution measurements with bounded uncertainty.
HyperNav was successfully deployed in 2022 and collected pre-launch SVC measurements. The system has been deployed at four (4) different sites – Hawaii, Mo’orea, Crete, and Puerto Rico – using eight (8) HyperNav radiometric systems and eight (8) floats. These rotational deployments are approximately 60 days in duration. Over the past year, HyperNav completed twenty (20) deployments, collecting over seven hundred fifty (750) radiometric profiles. This data is currently being used by the PACE team to determine the gain coefficients for the PACE OCI sensor.
3. Objective
The objective of this contract is to sustain HyperNav operations and the collection of SVC-quality data in support of the validation of the PACE mission measurements and calibration of PACE OCI sensor products.
4. Technical Requirements
The work to be performed under this SOW includes:
4.1 HyperNav System Deployments. The Contractor shall conduct eight (8) HyperNav system deployments per year across three (3) geographical sites over the period of performance. Deployments shall be distributed as follows: three (3) deployments at the Hawaii site, three (3) deployments at the Mo'orea site, and two (2) deployments at the Puerto Rico site. Each deployment shall have a nominal duration of sixty (60) days. The Contractor shall maintain eight (8) HyperNav radiometric systems and associated float platforms to support rotational deployment operations. Deployments shall be scheduled to optimize clear-sky conditions and maintain at