Home / F110 Rotor Fan Aircraft, NSN: 2840-01-580-7062PR, PN… / Document

Synopsis PR27 00073 3R

Updated

A PDF document (133 KB) attached to F110 Rotor Fan Aircraft, NSN: 2840-01-580-7062PR, PN: 9547M28G15, from the Defense Logistics Agency. Due Dec 14, 2026, 4:00 PM (UTC-6).

File name: Synopsis_PR27_00073_3R_26 Oct 26.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

1. Estimated issue date and estimated closing/response date: Issue: 13 November 2026
Closes: 14 December 2026
2. RFP: SPRTA1-27-R-0063; PR: FD2030-27-00073.
3. Service/Spare/Repair/OH: Spares.
4. AMC: 3/R.
5. Nomenclature/Noun: Rotor Fan Aircraft.
6. NSN: 2840-01-580-7062PR.
7. PN: 9547M28G15.
8. History: Last procured: 05 Sep 2024; General Electric Company; CAGE: 07482. 9. Description/Function: DIM: L= 28.0000 in; W= 38.0000 in; H= 38.0000 in; WT= 413.0000 (LB). Material: Titanium metal. Function: Increases airflow in and around the engine. 10. Total Line-Item Quantity: L/I 0001: 25 EA. Min – 6 EA; Max – 43 EA. 11. Application (Aircraft): F110.
12. Destination: L/I 0001: SW3211, Tinker AFB, OK; MARK For: Acct 09. 13. Required Delivery: L/I 0001: Delivery Number 1: 1 unit on 18 JAN 2027. Early delivery is acceptable. Delivery Number 2: 1 unit on 18 FEB 2027. Early delivery is acceptable. Delivery Number 3: 1 unit on 18 MAR 2027. Early delivery is acceptable. Delivery Number 4: 1 unit on 18 APR 2027. Early delivery is acceptable. Delivery Number 5: 1 unit on 18 MAY 2027. Early delivery is acceptable. Delivery Number 6: 1 unit on 18 JUN 2027. Early delivery is acceptable. Delivery Number 7: 1 unit on 18 JUL 2027. Early delivery is acceptable. Delivery Number 8: 1 unit on 18 AUG 2027. Early delivery is acceptable. Delivery Number 9: 1 unit on 18 SEP 2027. Early delivery is acceptable. Delivery Number 10: 1 unit on 18 OCT 2027. Early delivery is acceptable. Delivery Number 11: 1 unit on 18 NOV 2027. Early delivery is acceptable. Delivery Number 12: 1 unit on 18 DEC 2027. Early delivery is acceptable. Delivery Number 13: 1 unit on 18 JAN 2028. Early delivery is acceptable. Delivery Number 14: 1 unit on 18 FEB 2028. Early delivery is acceptable. Delivery Number 15: 1 unit on 18 MAR 2028. Early delivery is acceptable. Delivery Number 16: 1 unit on 18 APR 2028. Early delivery is acceptable. Delivery Number 17: 1 unit on 18 MAY 2028. Early delivery is acceptable. Delivery Number 18: 1 unit on 18 JUN 2028. Early delivery is acceptable. Delivery Number 19: 1 unit on 18 JUL 2028. Early delivery is acceptable. Delivery Number 20: 1 unit on 18 AUG 2028. Early delivery is acceptable. Delivery Number 21: 1 unit on 18 SEP 2028. Early delivery is acceptable. Delivery Number 22: 1 unit on 18 OCT 2028. Early delivery is acceptable. Delivery Number 23: 1 unit on 18 NOV 2028. Early delivery is acceptable. Delivery Number 24: 1 unit on 18 DEC 2028. Early delivery is acceptable.

The beginning of the document. Download the full file to read on.