STATEMENT OF WORK
1. Objective/Requirements
NASA Kennedy Space Center has a requirement for the Vision Technologies Installation Services; the specifics are listed below.
2. Characteristics, Scope, and Specs
Description
Donor Signal Cellular DAS supporting LTE and NR services* - includes materials, project management and engineering services to provide cellular coverage to the NASA KSC K6 B2496 building.
Qty
Vision will provide a design to provide coverage to the specified area mentioned above of the NASA KSC K6 B2496 building in accordance with industry requirements and standards. 2. The deliverables will include submittal drawings for approval, antenna placement locations, testing methodology and results as outlined in the requirements. 3. Vision will procure all DAS-related materials and install the head end/active equipment. This proposal assumes that the cabling and antenna installation will be provided by others. 4. Upon completion of the system installation, Vision will configure and test the system for proper operation. Vision engineers will perform the system commissioning. Vision will perform system testing to ensure the DAS is functioning properly with a live signal. After system activation, Vision will monitor the system for some time and ensure the system is properly operating and properly balanced.
Once system is in normal operation, Vision will conduct a final verification testing and perform a validation survey.
Vision’s close-out documentation will include:
-System as-built information-equipment locations
-System test results
-Firmware revisions and configuration, equipment serial numbers -Documentation of coverage.
-Warranty Documentation
3. Place of Performance
NASA Kennedy Space Center
State Road 40, Merritt Island, Florida
K6 B2496
ATTN: James Bjornbak
4. Period of Performance
30 days ARO