Tab 04 4 Statement of Work
Updated
A PDF document (139 KB) attached to Vision Procurement - CDAS expansion for KSC Launch Command Center, from the National Aeronautics and Space Administration. Due Nov 6, 2026, 3:00 PM (UTC-6).
File name: SATPC0043184 Tab 04 4 SOW.pdf
The full file is for paid members, or buy this bid alone.
Preview
STATEMENT OF WORK
1. Objective/Requirements
NASA Kennedy Space Center has a requirement for the Vision Procurement - CDAS expansion for KSC Launch Command Center; the specifics are listed below.
2. Characteristics, Scope, and Specs
Description
All Floors for M3 (Hybrid fiber coax)
Includes materials, project management, and engineering services to provide cellular coverage to the NASA KSC LCC building but excludes installation and cabling materials. DAS system will connect to existing RF Signals sources already onsite.
Qty
Vision will provide a design to provide coverage to the specified area mentioned above of the NASA LCC building in accordance with industry requirements and standards. 2. The deliverables will include submittal drawings for approval, antenna placement locations, testing methodology and results as outlined in the requirements. 3. Vision will procure all DAS-related materials and install the head end/active equipment. This proposal assumes that the cabling and antenna installation will be provided by others. 4. Upon completion of the system installation, Vision will configure and test the system for proper operation. Vision engineers will perform the system commissioning. Vision will perform system testing to ensure the DAS is functioning properly with a live signal. After system activation, Vision will monitor the system for some time and ensure the system is properly operating and properly balanced.
Once system is in normal operation, Vision will conduct a final verification testing and perform a validation survey.
Vision’s close-out documentation will include:
-System as-built information-equipment locations
-System test results
-Firmware revisions and configuration, equipment serial numbers -Documentation of coverage.
-Warranty Documentation
3. Place of Performance
NASA Kennedy Space Center
State Road 40, Merritt Island, Florida
K6 B2496
ATTN: James Bjornbak
4. Period of Performance
30 days ARO
The beginning of the document. Download the full file to read on.