Tab 04 4 Statement of Work
Updated
A PDF document (212 KB) attached to CSI Digital Correlation Systems, from the National Aeronautics and Space Administration. Due Nov 16, 2026, 3:00 PM (UTC-6).
File name: SATPC0043128 Tab 04 4 SOW.pdf
The full file is for paid members, or buy this bid alone.
Preview
STATEMENT OF WORK
1. Objective/Requirements
NASA Glenn Research Center (GRC) has a requirement to purchase six Digital Image Correlation (DIC) systems to be used for in-situ strain measurement to measure the strain of samples at elevated temperatures in an environmental chamber.
2. Characteristics, Scope, and Specs
Part Number
VIC-2D
Description
VIC-2D Digital Image Correlation System:
6x VIC-2D 8 with iris Digital Image Correlation Analysis Software
6x Vic-Snap LS Image Acquisition Software
6x Vic-Gauge 2D Real-Time Strain Monitoring Software
1x Includes one post-processing license on USB dongle
6x Compact PC I - 4TB m.2 + 8 TB SSD, 64GB RAM,
Win11, K&M, & LCD Monitor
6x 8 Megapixel (2840 x 2840 @ 14 fps) Digital Camera
GigE Interface Mono Color with trigger cable
6x PoE Single Port Injector
6x CSI camera mount
6x Analog data acquisition system for LS, Gauge, & HS up to 250KS/s /8 channels
6x Manual Trigger Switch
2x hard-sided carrying cases for cameras and accessories Two year warranty on all non-consumables
QTY
Deliverables:
Deliverable
Description
Due Date
Software Lifecycle and Delivery of complete purchased Entitlement Data, using Within 5 Asset Management
the SLAM – NASA Entitlement Reporting Form
business days of
(link to template provided upon award)
(SLAM) – NASA
order
Entitlement Reporting
Form
3. Place of Performance
NASA Glenn Research Center
High Temperature and Smart Alloys
Branch NASA Glenn Research Center
21000 Brookpark Rd MS 49-7
Cleveland, OH 44135
4. Period of Performance
6-8 Weeks ARO
The beginning of the document. Download the full file to read on.