STATEMENT OF WORK

1. Objective/Requirements

Recertify CMASS Ammonia cylinders for Artemis III+

DESCRIPTION OF WORK

For each of the ammonia cylinders being sent out, perform the following: 1. Remove surface corrosion per MPCV 70156 TABLE C 1.0-1 2. Touch up areas of paint, as required, with Aqua-Shield and match the current color of the cylinders as a best effort basis. Area of touch up should be prepared and coating applied per manufacturer instructions. 2.1. If a full repaint of the cylinders are required: Prepare surface for corrosion control, and painting touch up paint per manufacturer’s instructions if that is not possible then, Prepare and paint carbon steel as follows: Degrease per SSPC-SP 1, mechanically clean per SSPC-SP 2 or SSPC-SP 3 and abrasive blast per SSPC-SP 10 to an anchor profile of 1.5-3.0 mils. All rust shall be completely removed from pits and depressions. Remove abrasive residue. Clean and dry the surfaces. apply a brush coating or stripe coating with an inorganic zinc coating on all cutouts and sharp edges. Apply a 4-6 mil dry film thickness inorganic zinc (IOZ) coating (conforming to paragraph 4.1.2.1 of NASA-STD-5008) from the approved products list of NASA-STD-5008 appendix a. The application of the coating to the thickness required shall comply with the manufacturer’s recommendations. NACE inspection is required for all surface preparations and coating applications per section 5.2 of NASA-STD-5008. Paint cylinder surface to match best effort color match 3. Perform required 5-year inspection and requalification per 49 CFR 180.209, 49 CFR 180.215, and per CGA Pamphlet C-6 or C-6.3
4. Mark cylinders with Inspection requalification date, apply hazardous material sticker
5. Provide certificate of inspection, including RIN, provide an inspection report in prescribed form of the results of the cylinder retest and/or inspection. 6. Refill with anhydrous ammonia that meets the requirements of MPCV 70156 Table 3.5-4 “Ammonia” Procurement column.
7. Return cylinders to KSC.
For any cylinder that fails recertification perform the following:

1. Remove dual valve assembly with attached dip tube, neck rings and caps from cylinders and return to KSC.
2. Dispose of ammonia cylinder.

SUBMITTAL REQUIREMENTS

Work Schedule
Work must be complete in time to support Artemis III Orion processing. Technical
The Subcontractor shall submit all quality documentation and certifications for personnel supporting the machining/fabrication tasks and for any material purchased and provided