Statement of Work for
Drive Motor #1 Blower Fan Motors Refurbishment
,
6/2026
11/16/2026
Project Overview: The drive for the wind tunnel compressor consists of four motors which can be coupled together or run separately. To cool the windings of the drive motors, each drive motor has a pair of blowers mounted in the basement beneath the drive motor. The blower wheels are overhung on dual shaft 200hp motors. See Figure 1 below.
Figure 1: Main Drive Blower Motors
This Statement of Work outlines the requirements for the removal, refurbishment, and reinstallation of two (2) 200 HP General Electric (GE) induction motor at the Unitary Plan Wind Tunnel facility in Moffett Field, CA. The two blower motors to be refurbished are the two blower motors associated with main drive motor #1. Removal of the motors will be difficult because of their position in the basement of the switchgear room. A job walk is required to understand the complexity of the motor removal. The period of performance will begin on or near April 12, 2027 or as determined by the Branch Chief, Facility Chief, and Facility Managers so long as there are no hindrances to wind tunnel operations. The scope includes vibration analysis, electrical disconnection, rigging, transportation, refurbishment, and reinstallation of the refurbished motors. The project duration should not exceed a 40-day duration. 6/2026
11/16/2026
The work will be performed by [Contractor Name], hereinafter referred to as “Contractor,” in coordination with [NASA Ames Unitary Plan Wind Tunnel], hereinafter referred to as “Owner.” The NASA Project Manager is Carl Kruger.
Contractors shall provide a fixed price quote. Prevailing wage requirements do not apply. Access to Site:
Note: All personnel on site shall be a “US Person”. A “US Person” is defined as any individual who is granted U.S. citizenship; or any individual who is granted U.S. permanent residence ("Green Card" holder); or any individual who is granted status as a "protected person" under 8 U.S.C. 1324b(a)(3). Real ID driver’s license is required to enter the center.
A NASA badge or visitor’s pass is required to enter the NASA Ames Research Center. The names of each worker needing a visitor pass shall be sent to the Amentum/NASA Project Manager (Electrical Craft Supervisor) at least three business days prior to any work date on site. Each worker will be sent an automated email with a prescreening questionnaire. If they fail to provide the requested information 48 hours in advance, they may be