Tab 10 Questions
Updated
A PDF document (184 KB) attached to Universal Robotics UR30 Robot Workstation and Console, from the National Aeronautics and Space Administration. Due Nov 3, 2026, 4:00 PM (UTC-6).
File name: SATPC0042910 Tab 10 Questions.pdf
The full file is for paid members, or buy this bid alone.
Preview
SATPC0042910 / 80NSSC27945558Q
Universal Robotics UR30 Robot Workstation and Console
Questions and Answers
1. The notice states that vendors must confirm authorization to resell the items listed in the Statement of Work (SOW). Since the Statement of Work includes components from multiple manufacturers in addition to Universal Robots USA, Inc., does the authorization requirement apply to:
A. All manufacturers represented in the SOW; or
B. Only the Universal Robots brand-name equipment, with the remaining components permitted to be sourced through standard commercial channels? Answer: All manufacturer represented in the SOW.
2. Delivery: The SOW lists a period of performance of 30 days ARO, which includes shop assembly of the workstation and 5 days of on-site applications engineering. Universal Robots and tooling lead times can run longer than 30 days. Would the Government accept a delivery of up to 60 days ARO, or allow offerors to propose their best lead time without being found unacceptable?
Answer: Hardware shall be delivered FOB Destination within 90 days ARO. Offerors shall state their proposed hardware lead time in the quote; a lead time within this period will not be found unacceptable. The 20 hours of workstation assembly shall be completed prior to shipment and is included in the hardware lead time. The 5 days of on-site applications engineering shall be scheduled by mutual agreement within 30 days after delivery and are not counted against the hardware lead time. Partial shipments are acceptable; final acceptance occurs upon completion of the on-site applications engineering.
3. Delivery address: Please confirm the ship-to and service location at Marshall Space Flight Center (building and any receiving or badging instructions for the field engineer).
Answer: Ship to: NASA Marshall Space Flight Center, Central Receiving, Huntsville, AL 35812, Attn: Jarvis Caffrey – 256-544-8464. On-site work will be performed in Building 4475. Contractor personnel will be badged as visitors in accordance with FAR 52.204-9 and escorted by NASA personnel; the Contractor shall provide personnel names and citizenship 7 business days in advance of the visit. Foreign nationals require advance approval and additional lead time.
SATPC0042910 / 80NSSC27945558Q
4. Line "1100526749, Electrical components for workstation, 1 EA": Is there a drawing, bill of materials or quote reference that defines this line, so all offerors price the same scope?
Answer: This line consists of the electrical components required to assemble and
The beginning of the document. Download the full file to read on.