Home / Civilian Mariner Wireless Network (CivMar WiN) Installation… / Document

Tab A JA CIVMAR WiN COMSC Signature Redacted

Updated

A PDF document (1.3 MB) attached to Civilian Mariner Wireless Network (CivMar WiN) Installation and Sustainment Follow-on Contract, from the Department of the Navy. Due Nov 2, 2026, 4:00 PM (UTC-5).

File name: Tab A_JA_CIVMAR_WiN_COMSC Signature_Redacted.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

CUI

J&A No. N10226R6001

Specifically, for follow-on contracts involving highly specialized services, subparagraph (c)(2) allows for a sole-source award if it is likely that choosing another source would lead to substantial duplication of cost to the Government that is not expected to be recovered through competition and/or unacceptable delays in fulfilling the agency's requirements. Awarding this contract to any source other than BAH would result in substantial cost duplication and unacceptable delays.
Background
BAH was competitively selected to develop and demonstrate the wireless prototype under the Other Transactional Authority (OTA) contract IRWP-22-LANT-1173. Following their successful completion, they were awarded a follow-on production contract (N3220525C1201) by MSC to expand the capability. To date, BAH has successfully installed, operated, and sustained the communications infrastructure across seventeen (17) MSC ships, with installation on twenty-four (24) additional ships being procured under Contract N3220525C1201.
The upcoming requirement is to scale this solution to full production, which includes installing the system on forty-eight (48) new ships, executing a technology refresh on thirty-five (35) existing vessels, expanding network capabilities and providing total operational support for CivMar WiN afloat on eighty-three (83) ships, and ashore in (1) development instance, one (1) production baseline instance at a government facility, and associated cloud management environments.
Justification for Sole-Source Award
x Substantial Duplication of Cost: BAH has already absorbed the significant non-recurring engineering (NRE) costs, established an efficient production process, and overcome the initial learning curve. A new contractor would have to replicate these efforts, forcing the government to pay for the same development and optimization work a second time. $
of NRE costs were expended as part of the
OTA contract to provide a prototype of CivMar WiN on Combat Logistics Force (CLF) ships. To date, approximately $
has been expended on the follow-on production contract to migrate to a government cloud environment, provide centralized management, and expand the network to other ship classes. $
has been applied towards engineering Flank Speed Edge prototype to expand CivMar WiN to handle operational traffic. These costs to the Government are not expected to be recovered through competition
x

Unacceptable Delays: As the incumbent, BAH can provide a seamless continuation of service and

The beginning of the document. Download the full file to read on.